Home Projects More like: TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability [Clear] # Title Funder Funding Start End Status 1 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC £499,515 Feb. 12, 2020 Aug. 11, 2021 Closed 2 ASPIRE (Advanced Surface Protection for Improved Renewable Energy) Innovate UK £1,249,244 Jan. 1, 2013 Dec. 31, 2015 Closed 3 ASPIRE (Advanced Surface Protection for Improved Renewable Energy) Innovate UK £3,123,110 Jan. 1, 2013 Dec. 31, 2015 Closed 4 Ultra-Supercritical (USC) steam power generation technology with Circulating Fluidized Bed (CFB): Combustion, Materials and Modelling (USC-CFB-CMM) EPSRC £2,066,770 March 31, 2015 Nov. 30, 2018 Closed 5 Ultra-Supercritical (USC) steam power generation technology with Circulating Fluidized Bed (CFB): Combustion, Materials and Modelling (USC-CFB-CMM) EPSRC £5,166,925 March 31, 2015 Nov. 30, 2018 Closed 6 Novel low energy plasma/catalytic gas cleaning process to deliver high quality syngas from the gasification of waste biomass EPSRC £1,823,078 Jan. 1, 2015 Aug. 30, 2018 Closed 7 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC £7,051,488 March 31, 2014 Sept. 13, 2024 Active 8 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC £17,639,430 March 31, 2014 Sept. 14, 2024 Active 9 Development of solidification techniques with minimised water content for safe storage of secondary radioactive aqueous wastes in Fukushima EPSRC £1,556,565 Nov. 30, 2015 June 30, 2018 Closed 10 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC £778,028 Jan. 1, 2012 June 29, 2015 Closed 11 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC £1,945,070 Jan. 1, 2012 June 30, 2015 Closed 12 Bio-CO2: Power Generation and Heat Recovery from Biomass with Advanced CO2 Thermodynamic Power Cycles and Novel Heat Exchanger Designs EPSRC £74,814 Sept. 30, 2020 Sept. 29, 2021 Closed 13 Bio-CO2: Power Generation and Heat Recovery from Biomass with Advanced CO2 Thermodynamic Power Cycles and Novel Heat Exchanger Designs EPSRC £362,286 April 10, 2018 June 30, 2020 Closed 14 Bio-CO2: Power Generation and Heat Recovery from Biomass with Advanced CO2 Thermodynamic Power Cycles and Novel Heat Exchanger Designs EPSRC £396,764 Aug. 31, 2017 Jan. 11, 2018 Closed 15 Bio-CO2: Power Generation and Heat Recovery from Biomass with Advanced CO2 Thermodynamic Power Cycles and Novel Heat Exchanger Designs EPSRC £905,715 April 10, 2018 July 1, 2020 Closed 16 Bio-CO2: Power Generation and Heat Recovery from Biomass with Advanced CO2 Thermodynamic Power Cycles and Novel Heat Exchanger Designs EPSRC £187,035 Sept. 30, 2020 Sept. 30, 2021 Closed 17 Bio-CO2: Power Generation and Heat Recovery from Biomass with Advanced CO2 Thermodynamic Power Cycles and Novel Heat Exchanger Designs EPSRC £991,910 Aug. 31, 2017 Jan. 11, 2018 Closed 18 Flexible and Efficient Power Plant: Flex-E-Plant EPSRC £5,991,000 July 31, 2013 Feb. 28, 2018 Closed 19 Flexible and Efficient Power Plant: Flex-E-Plant EPSRC £9,985,000 July 31, 2013 Feb. 28, 2018 Closed 20 Effective Adsorbents for Establishing Solids Looping as a Next Generation NG PCC Technology EPSRC £1,513,108 Jan. 1, 2013 Oct. 31, 2016 Closed Reset Search Term(s): Status: --------- Active Closed Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »