Home Projects More like: Test Application [Clear] # Title Funder Funding Start End Status 81 Disaster management and resilience in electric power systems EPSRC £482,152 Feb. 1, 2016 April 29, 2018 Closed 82 Accelerating the Exploitation Plan and Route to Market of Milk Chilling Centre Energy Hubs Innovate UK £15,000 Dec. 1, 2021 Jan. 31, 2022 Closed 83 Accelerating the Exploitation Plan and Route to Market of Milk Chilling Centre Energy Hubs Innovate UK £37,500 Dec. 1, 2021 Jan. 31, 2022 Closed 84 Probabilistic approach to power system planning and pricing EPSRC £0 Sept. 30, 2020 Sept. 29, 2025 Active 85 Blockchain Enabled Vehicle to Local Grid (BEV2LG) Innovate UK £284,458 Feb. 1, 2018 March 31, 2019 Closed 86 Blockchain Enabled Vehicle to Local Grid (BEV2LG) Innovate UK £711,145 Feb. 1, 2018 March 31, 2019 Closed 87 Storage Enabled Vehicle Charge Point (SEVCP) Innovate UK £196,240 Feb. 1, 2017 Jan. 31, 2018 Closed 88 Storage Enabled Vehicle Charge Point (SEVCP) Innovate UK £490,600 Feb. 1, 2017 Jan. 31, 2018 Closed 89 Electric vehicle charge point integrated with battery storage - Evstor Innovate UK £103,082 March 1, 2017 Nov. 30, 2017 Closed 90 Electric vehicle charge point integrated with battery storage - Evstor Innovate UK £257,705 March 1, 2017 Nov. 30, 2017 Closed 91 Whole Energy System: Levenmouth Integrated Demonstration (WESLID) - Concept and Design Study Innovate UK £283,910 Dec. 1, 2018 May 30, 2019 Closed 92 Whole Energy System: Levenmouth Integrated Demonstration (WESLID) - Concept and Design Study ISCF £709,775 Dec. 1, 2018 May 31, 2019 Closed 93 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK £812,924 Aug. 31, 2022 Aug. 30, 2024 Active 94 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK £4,064,620 Aug. 31, 2022 Aug. 31, 2024 Active 95 Combustor thermoacoustics for multi-burner low emissions gas turbines (CHAMBER) EPSRC £1,514,258 Jan. 1, 2017 Dec. 31, 2020 Closed 96 AI applications in future energy markets: Market implications and regulatory requirements ESRC £0 Sept. 30, 2020 Nov. 30, 2021 Closed 97 AI applications in future energy markets: Market implications and regulatory requirements ESRC £0 Sept. 30, 2020 Nov. 30, 2021 Closed 98 Decarbonising Transport through Electrification, a Whole System Approach (DTE) EPSRC £1,831,714 Aug. 31, 2019 April 29, 2023 Active 99 Decarbonising Transport through Electrification, a Whole System Approach (DTE) EPSRC £4,579,285 Aug. 31, 2019 Dec. 31, 2023 Active 100 Mobile Power Ltd Innovate UK £4,947,620 March 6, 2020 March 6, 2022 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »