Home Projects More like: Nonlinear Adaptive Control of Doubly-fed Induction Generator for Variable Speed Wind Turbine [Clear] # Title Funder Funding Start End Status 41 Impact on Renewable Energy Sources on Harmonic Levels in the Future UK Power Grid: Modelling, Assessment and Mitigating Solutions EPSRC £565,690 July 31, 2021 May 31, 2022 Closed 42 Impact on Renewable Energy Sources on Harmonic Levels in the Future UK Power Grid: Modelling, Assessment and Mitigating Solutions EPSRC £1,219,755 May 31, 2020 July 31, 2021 Closed 43 Impact on Renewable Energy Sources on Harmonic Levels in the Future UK Power Grid: Modelling, Assessment and Mitigating Solutions EPSRC £487,902 May 31, 2020 July 30, 2021 Closed 44 Ultra-efficient grid-tie inverter technology EPSRC £197,588 Aug. 31, 2013 May 30, 2015 Closed 45 Ultra-efficient grid-tie inverter technology EPSRC £493,970 Aug. 31, 2013 May 31, 2015 Closed 46 Intelligent and Integrated Condition Monitoring of Distributed Generation Systems EPSRC £198,046 Jan. 16, 2012 May 14, 2013 Closed 47 Intelligent and Integrated Condition Monitoring of Distributed Generation Systems EPSRC £495,115 Jan. 16, 2012 May 15, 2013 Closed 48 Designing the next generation of wind turbine converter controllers for wind power applications: Enhancing the power system reliability, stability and EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 49 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 50 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £199,530 April 16, 2013 Aug. 15, 2015 Closed 51 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £498,825 April 16, 2013 Aug. 16, 2015 Closed 52 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £1,280,436 July 30, 2014 Feb. 28, 2018 Closed 53 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £3,201,090 July 30, 2014 Feb. 28, 2018 Closed 54 Planar fault energies to order EPSRC £285,810 May 31, 2015 May 30, 2016 Closed 55 Targeted energy transfer in powertrains to reduce vibration-induced energy losses EPSRC £1,029,494 June 29, 2014 Jan. 3, 2018 Closed 56 Targeted energy transfer in powertrains to reduce vibration-induced energy losses EPSRC £2,573,735 June 29, 2014 Jan. 3, 2018 Closed 57 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £2,436,242 Sept. 30, 2017 Dec. 31, 2021 Closed 58 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £6,090,605 Sept. 30, 2017 Dec. 31, 2021 Closed 59 Modelling, Optimisation and Design of Conversion for Offshore Renewable Energy (UK-China MOD-CORE) EPSRC £1,618,216 June 30, 2017 Jan. 2, 2021 Closed 60 Modelling, Optimisation and Design of Conversion for Offshore Renewable Energy (UK-China MOD-CORE) Newton Fund £4,045,540 June 30, 2017 Jan. 2, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »