# Title Funder Funding Start End Status
81 DC networks, power quality and plant reliability EPSRC
£1,306,518
Jan. 6, 2020 June 29, 2024 Active
82 DC networks, power quality and plant reliability EPSRC
£3,635,775
Nov. 1, 2019 Dec. 31, 2023 Active
83 Distributed multiport converters for integration of renewables, storage systems and loads while enhancing performance and resiliency of modern distributed networks (iPLUG) Horizon Europe Guarantee
£1,614,590
Aug. 31, 2022 Aug. 31, 2025 Active
84 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC
£2,398,464
Nov. 1, 2018 Oct. 31, 2022 Active
85 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC
£5,996,160
Nov. 1, 2018 Oct. 31, 2022 Closed
86 Analytical Middleware for Informed Distribution Networks (AMIDiNe) EPSRC
£1,406,182
Sept. 30, 2019 Sept. 29, 2022 Active
87 Analytical Middleware for Informed Distribution Networks (AMIDiNe) EPSRC
£3,515,455
Sept. 30, 2019 Sept. 30, 2022 Closed
88 FOR2ENSICS Horizon Europe Guarantee
£2,257,105
Jan. 1, 2023 Dec. 31, 2026 Active
89 Advanced Gate Driving for Wide Bandgap Devices - 1=Energy 2=Microelectronic device technology EPSRC
£0
Sept. 29, 2019 March 30, 2023 Active
90 Analysis of Power Quality in Complex DC Power Networks EPSRC
£199,532
June 29, 2015 Sept. 29, 2016 Closed
91 Analysis of Power Quality in Complex DC Power Networks EPSRC
£498,830
June 29, 2015 Sept. 30, 2016 Closed
92 Model reduction from data EPSRC
£4,038,210
March 31, 2022 March 31, 2025 Active
93 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC
£503,635
March 21, 2017 May 24, 2018 Closed
94 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC
£201,454
March 21, 2017 May 23, 2018 Closed
95 The Flexible Fuel Cell EPSRC
£356,918
Sept. 27, 2009 March 27, 2013 Closed
96 The Flexible Fuel Cell EPSRC
£434,982
Sept. 30, 2009 March 31, 2013 Closed
97 The Flexible Fuel Cell EPSRC
£1,087,455
Sept. 30, 2009 March 31, 2013 Closed
98 LATENT: RESIDENTIAL HEAT AS AN ENERGY SYSTEM SERVICE EPSRC
£2,628,182
Sept. 30, 2020 Sept. 29, 2024 Active
99 LATENT: RESIDENTIAL HEAT AS AN ENERGY SYSTEM SERVICE EPSRC
£6,570,455
Sept. 30, 2020 Sept. 30, 2024 Active
100 A Hybrid PV-Battery Unit Optimised for LV Grids Using GaN Transistors EPSRC
£245,786
March 1, 2016 Jan. 31, 2017 Closed
Reset