# Title Funder Funding Start End Status
21 MOF BASED ADSORPTION SYSTEM FOR INTEGRATED ENERGY STORAGE AND POWER GENERATION EPSRC
£490,735
March 31, 2014 March 31, 2015 Closed
22 19-ERACoBioTech: Sustainable Production of n-Butanol by Artificial Consortia Through Synthetic and Systems Biology Approaches (SynConsor4Butonal) BBSRC
£773,566
Aug. 31, 2020 Aug. 30, 2023 Active
23 19-ERACoBioTech: Sustainable Production of n-Butanol by Artificial Consortia Through Synthetic and Systems Biology Approaches (SynConsor4Butonal) BBSRC
£1,933,915
Aug. 31, 2020 March 31, 2024 Active
24 Materials for Renewable Energy NaturE's Way (RENEW) EPSRC
£1,083,694
Jan. 14, 2013 Jan. 13, 2018 Closed
25 Materials for Renewable Energy NaturE's Way (RENEW) EPSRC
£2,709,235
Jan. 14, 2013 Jan. 13, 2018 Closed
26 EPSRC Centre for Doctoral Training in Sustainable Hydrogen - SusHy EPSRC
£13,154,852
March 31, 2019 Sept. 29, 2027 Active
27 Digital City Exchange EPSRC
£11,860,958
Sept. 18, 2011 Sept. 17, 2017 Closed
28 Digital City Exchange EPSRC
£29,652,395
Sept. 18, 2011 Sept. 18, 2017 Closed
29 Building as a Power Plant: The use of buildings to provide demand response EPSRC
£334,176
July 31, 2017 March 31, 2019 Closed
30 Building as a Power Plant: The use of buildings to provide demand response EPSRC
£835,440
July 31, 2017 March 31, 2019 Closed
31 17-ERACoBioTech: Sustainable production of added value chemicals from SynGas-derived methanol through Systems and Synthetic Biology approaches BBSRC
£853,042
April 30, 2018 Dec. 31, 2021 Closed
32 Ebbs and Flows of Energy Systems (EFES) EPSRC
£217,112
Jan. 1, 2015 Dec. 31, 2017 Closed
33 Ebbs and Flows of Energy Systems (EFES) EPSRC
£542,780
Jan. 1, 2015 Dec. 31, 2017 Closed
34 Land of the MUSCos EPSRC
£1,149,912
Dec. 1, 2011 Nov. 30, 2014 Closed
35 LUSTER - London Urban Sub-Terrain Energy Recovery EPSRC
£908,900
Aug. 31, 2017 Nov. 30, 2019 Closed
36 SolaNetWork EPSRC
£423,432
June 30, 2019 June 29, 2021 Closed
37 SolaNetWork EPSRC
£1,058,580
June 30, 2019 June 30, 2021 Closed
38 Data4Sustain - integration of data to facilitate renewable energy technology use within urban environments NERC
£206,975
July 1, 2015 July 1, 2016 Closed
39 Design Feasibility Study for a Low Velocity Tidal Stream Turbine EPSRC
£395,774
Jan. 1, 2018 Dec. 31, 2019 Closed
40 Design Feasibility Study for a Low Velocity Tidal Stream Turbine EPSRC
£989,435
Jan. 1, 2018 Dec. 31, 2019 Closed
Reset