Home Projects More like: MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) [Clear] # Title Funder Funding Start End Status 1 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £7,383,470 Nov. 2, 2015 May 1, 2019 Closed 2 SWEPT2 EPSRC £179,650 April 30, 2015 April 29, 2018 Closed 3 SWEPT2 EPSRC £449,125 April 30, 2015 April 30, 2018 Closed 4 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 5 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 6 Scale-resolving simulations of atmosphere / wind farm interactions NERC £0 Sept. 30, 2021 March 30, 2025 Active 7 Scale-resolving simulations of atmosphere / wind farm interactions NERC £0 Sept. 30, 2021 March 31, 2025 Active 8 Use of Wind Farm Control on floating platforms for the U.S. offshore wind market, CONFLOWS Innovate UK £609,893 May 31, 2021 March 30, 2023 Active 9 Use of Wind Farm Control on floating platforms for the U.S. offshore wind market, CONFLOWS Innovate UK £914,838 May 31, 2021 March 31, 2023 Closed 10 SWEPT2 EPSRC £78,596 April 30, 2015 April 29, 2018 Closed 11 SWEPT2 EPSRC £196,490 April 30, 2015 April 30, 2018 Closed 12 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 13 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 30, 2025 Active 14 FENGBO-WIND - Farming the ENvironment into the Grid: Big data in Offshore Wind EPSRC £1,624,828 July 2, 2017 Jan. 2, 2021 Closed 15 FENGBO-WIND - Farming the ENvironment into the Grid: Big data in Offshore Wind Newton Fund £4,062,070 July 2, 2017 Jan. 2, 2021 Closed 16 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £276,434 Feb. 1, 2019 April 29, 2020 Closed 17 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £691,085 Feb. 1, 2019 April 30, 2020 Closed 18 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience UKRI £2,755,446 Feb. 1, 2022 Jan. 31, 2026 Active 19 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience FLF £6,888,615 Feb. 1, 2022 Jan. 31, 2026 Active 20 Supergen Wind Hub EPSRC £5,934,376 June 18, 2014 Sept. 17, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »