# Title Funder Funding Start End Status
61 Autonomous Vehicle for Inspection of offshore wind farm Subsea INfrastructure (AVISIoN) Innovate UK
£1,506,885
Sept. 30, 2017 Sept. 30, 2019 Closed
62 Development and numerical implementation of a Levelized Cost of Energy (LCoE) model for Floating Offshore Wind Turbines, for and optimisation framewor EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
63 Drone Swarm for Unmanned Inspection of Wind Turbines (Dr-SUIT): Battery Health Management, Hybrid Comms Systems and Operational Platform for Autonomous Offshore Windfarm Inspection Innovate UK
£2,352,471
March 1, 2021 Feb. 28, 2023 Active
64 Self-sensing wind turbine composite blades for structural health monitoring (SMARTBLADE) Innovate UK
£826,836
March 1, 2018 Feb. 29, 2020 Closed
65 Self-sensing wind turbine composite blades for structural health monitoring (SMARTBLADE) Innovate UK
£2,160,660
March 1, 2018 Feb. 29, 2020 Closed
66 System Level Design and Feasibility of the Myriad Multi-rotor Wind Turbine Concept Innovate UK
£47,190
Nov. 1, 2022 April 29, 2023 Active
67 Advanced study of the atmospheric flow Integrating REal climate conditions to enhance wind farm and wind turbine power production and increase components durability Horizon Europe Guarantee
£2,475,295
Jan. 1, 2023 Dec. 31, 2026 Active
68 Thrust-vectoring Drone Delivery and Remote Operation of a Wind Turbine Blade Autonomous Repair Manipulator (VECTARM) Innovate UK
£49,997
Nov. 1, 2022 April 29, 2023 Active
69 Unravelling the photochemistry of organometallic N-heterocyclic carbene complexes EPSRC
£239,620
Sept. 30, 2007 March 30, 2011 Closed
70 Unravelling the photochemistry of organometallic N-heterocyclic carbene complexes EPSRC
£599,050
Sept. 30, 2007 March 31, 2011 Closed
71 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK
£18,543,684
March 31, 2010 Dec. 31, 2015 Closed
72 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK
£30,906,140
March 31, 2010 Dec. 31, 2015 Closed
73 Experimental and Numerical analysis of a Floating Offshore Wind Turbine in waves and wind EPSRC
£0
Aug. 31, 2019 Aug. 30, 2023 Active
74 Development of a robotic maintenance system for wind turbine blades (ROMAIN) Horizon Europe Guarantee
£2,103,455
Aug. 31, 2022 Aug. 31, 2025 Active
75 Romain - Development of a robotic maintenance system for wind turbine blades Horizon Europe Guarantee
£2,163,905
Aug. 31, 2022 Aug. 31, 2025 Active
76 Dynamics of Mooring System for Floating Offshore Wind Turbine (FOWT) EPSRC
£0
Jan. 1, 2018 Sept. 29, 2021 Closed
77 Dynamics of Mooring System for Floating Offshore Wind Turbine (FOWT) EPSRC, NERC
£0
Jan. 1, 2018 Sept. 30, 2021 Closed
78 Unravelling the photochemistry of organometallic N-heterocyclic carbene complexes EPSRC
£285,644
Sept. 30, 2007 March 30, 2011 Closed
79 Unravelling the photochemistry of organometallic N-heterocyclic carbene complexes EPSRC
£714,110
Sept. 30, 2007 March 31, 2011 Closed
80 Computational and communication architectures for MMC VSC-HVDC Construction EPSRC
£0
Sept. 11, 2018 March 30, 2022 Active
Reset