Home Projects More like: Strategies for reducing cost of Engineering Optimisation [Clear] # Title Funder Funding Start End Status 1 Strategies for reducing cost of Engineering Optimisation EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed 2 Accelerating Computational Fluid Dynamics EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 3 Commercialisation of Shape Morphing and Optimisation Technology for Fluid-Dynamic Applications EPSRC £247,756 Sept. 30, 2008 Sept. 29, 2009 Closed 4 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 5 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 30, 2025 Active 6 Simulated Wake Effects Platform for Turbines (SWEPT) Innovate UK £211,710 May 31, 2013 May 30, 2014 Closed 7 Simulated Wake Effects Platform for Turbines (SWEPT) Innovate UK £529,275 May 31, 2013 May 31, 2014 Closed 8 Gas Turbine Stator-Well Flow and Heat Transfer. EPSRC £0 Sept. 27, 2020 Sept. 29, 2023 Active 9 Investigating the effect of blade topology on the performance of small-scale cryogenic turbines manufactured using various 3D printing materials EPSRC £0 Sept. 15, 2019 March 15, 2023 Active 10 Investigating the effect of blade topology on the performance of small-scale cryogenic turbines manufactured using various 3D printing materials EPSRC £0 Sept. 15, 2019 March 15, 2023 Closed 11 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £400,894 Oct. 2, 2016 Oct. 1, 2018 Closed 12 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £1,002,235 Oct. 2, 2016 Oct. 2, 2018 Closed 13 ENHANCING AEROMECHANICAL ANALYSIS AND DESIGN CAPABILITIES OF WIND TURBINE ROTORS BY MEANS OF NONLINEAR FREQUENCY-DOMAIN COMPUTATIONAL FLUID DYNAMICS EPSRC £604,084 Sept. 15, 2008 Sept. 14, 2011 Closed 14 ENHANCING AEROMECHANICAL ANALYSIS AND DESIGN CAPABILITIES OF WIND TURBINE ROTORS BY MEANS OF NONLINEAR FREQUENCY-DOMAIN COMPUTATIONAL FLUID DYNAMICS EPSRC £1,510,210 Sept. 15, 2008 Sept. 15, 2011 Closed 15 SWEPT 2 EPSRC £199,712 June 9, 2015 June 8, 2018 Closed 16 SWEPT 2 EPSRC £499,280 June 9, 2015 June 9, 2018 Closed 17 SysGenX: Composable software generation for system-level simulation at exascale EPSRC £1,958,054 Dec. 1, 2021 Nov. 30, 2025 Active 18 SysGenX: Composable software generation for system-level simulation at Exascale EPSRC £731,546 Dec. 1, 2021 Nov. 30, 2025 Active 19 SysGenX: Composable software generation for system-level simulation at Exascale EPSRC £1,529,730 Dec. 1, 2021 Nov. 30, 2025 Active 20 SysGenX: Composable software generation for system-level simulation at Exascale EPSRC £1,272,173 Dec. 1, 2021 Nov. 30, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »