Home Projects More like: A Multiscale Simulation Approach to Tackle Fuel Spray Atomisation and Combustion [Clear] # Title Funder Funding Start End Status 61 EPSRC-SFI:Tailored Production and Utilisation of Sustainable Low Cost Lignocellulosic Advanced Biofuel Blends as Diesel and Petrol Substitutes:SusLABB EPSRC £2,194,792 Jan. 1, 2021 Dec. 31, 2024 Active 62 EPSRC-SFI:Tailored Production and Utilisation of Sustainable Low Cost Lignocellulosic Advanced Biofuel Blends as Diesel and Petrol Substitutes:SusLABB EPSRC £5,486,980 Jan. 1, 2021 Dec. 31, 2024 Active 63 Multiscale modelling of mechanical deterioration in lithium-ion batteries EPSRC £621,220 March 16, 2020 March 15, 2023 Active 64 Multiscale modelling of mechanical deterioration in lithium-ion batteries EPSRC £1,553,050 March 16, 2020 Sept. 30, 2023 Closed 65 Radical Approaches In New materials Science and Engineering (RAiSE): building trust and transparency through virtual certification and digital design UKRI £1,713,428 Aug. 2, 2020 Aug. 1, 2024 Active 66 Center for Low Emission Vehicle Research (CLEVeR) EPSRC £358,470 Jan. 2, 2014 Jan. 1, 2017 Closed 67 Center for Low Emission Vehicle Research (CLEVeR) EPSRC £896,175 Jan. 2, 2014 Jan. 1, 2017 Closed 68 The integration of photovoltaic devices with carbon-fibre composites EPSRC £1,801,844 May 13, 2019 May 12, 2023 Active 69 A new family of electrolytes based on Na1/2Bi1/2TiO3 for intermediate-temperature solid oxide fuel cells EPSRC £941,740 Nov. 17, 2014 May 16, 2018 Closed 70 Nanocrystalline Water Splitting Photodiodes II; Device Engineering, Integration and Scale-up EPSRC £1,225,468 April 30, 2011 Oct. 31, 2014 Closed 71 Nanocrystalline Water Splitting Photodiodes II; Device Engineering, Integration and Scale-up EPSRC £3,063,670 April 30, 2011 Oct. 31, 2014 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »