# Title Funder Funding Start End Status
41 In situ blade inspection, cleaning and repair for offshore wind turbines using suspended work platforms Innovate UK
£221,262
May 31, 2013 May 30, 2014 Closed
42 Modelling Gas Turbine Blade Degradation in a High Fidelity Digital Twin EPSRC
£0
June 7, 2020 June 6, 2024 Active
43 Fatigue Effects in Composite Tidal Turbine Blades caused by Discrete Point Loading during Service EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
44 Step Change in Manufacture and Processing of Aerospace Superalloy Components Innovate UK
£799,966
Feb. 1, 2013 July 30, 2016 Closed
45 resinSENSE - real-time, on-line monitoring of resin mix-ratio monitoring system Innovate UK
£194,266
Aug. 31, 2022 Sept. 29, 2023 Active
46 resinSENSE - real-time, on-line monitoring of resin mix-ratio monitoring system Innovate UK
£971,330
Aug. 31, 2022 Sept. 30, 2023 Closed
47 High performance pultrusion for advanced composites (HIPPAC) Innovate UK
£590,322
Feb. 1, 2020 June 29, 2021 Closed
48 High performance pultrusion for advanced composites (HIPPAC) Innovate UK
£1,475,805
Feb. 1, 2020 June 30, 2021 Closed
49 Direct Fibre Optic Shape Sensing for Large Scale Engineering Structures EPSRC
£4,136,298
Sept. 30, 2021 Sept. 29, 2025 Active
50 Offshore Infrastructure Robotic Inspection System (OSIRIS) Demonstrator Innovate UK
£909,658
March 1, 2019 March 30, 2022 Active
51 Offshore Infrastructure Robotic Inspection System (OSIRIS) Demonstrator ISCF
£2,274,145
March 1, 2019 March 31, 2022 Closed
52 the noise reduction of wind turbine blade noise emission EPSRC
£0
Sept. 30, 2017 March 30, 2021 Closed
53 Thrust-vectoring Drone Delivery and Remote Operation of a Wind Turbine Blade Autonomous Repair Manipulator (VECTARM) Innovate UK
£49,997
Nov. 1, 2022 April 29, 2023 Active
54 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£202,124
May 31, 2018 June 29, 2020 Closed
55 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£505,310
May 31, 2018 June 30, 2020 Closed
56 Aerofoil noise reduction by active flow control EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
57 Research and Development of Wind Turbine internal blade inspection system - AI MVP Innovate UK
£180,306
Nov. 1, 2020 June 29, 2021 Closed
58 Wind Turbine Blade Condition Monitoring System Innovate UK
£139,806
Aug. 31, 2017 Aug. 30, 2018 Closed
59 Production of prototype internal blade inspection system for offshore wind turbines including cost benefit analysis. Innovate UK
£135,254
May 31, 2019 April 29, 2020 Closed
60 The University of Manchester and EDF Energy (West Burton Power) Limited Innovate UK
£179,492
Feb. 1, 2014 July 30, 2016 Closed
Reset