Home Projects More like: Wesley Turbine R&D [Clear] # Title Funder Funding Start End Status 1 Micro-CHP using steam ejector/water turbine (WaterGen) EPSRC £297,574 Jan. 1, 2016 Dec. 31, 2016 Closed 2 Micro-CHP using steam ejector/water turbine (WaterGen) EPSRC £743,935 Jan. 1, 2016 Dec. 31, 2016 Closed 3 Small Scale Biomass-Fired CHP System EPSRC £269,950 Jan. 1, 2007 Oct. 31, 2008 Closed 4 Small Scale Biomass-Fired CHP System EPSRC £674,875 Jan. 1, 2007 Oct. 31, 2008 Closed 5 Zero Emission Steam Velocity Assessment Innovate UK £99,450 June 30, 2023 Sept. 30, 2023 Closed 6 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant Innovate UK £1,275,538 April 30, 2016 April 29, 2019 Closed 7 Project Description for Measurement of In-Service Turbine Blade Clearance, and Transmission through the Casing Wall. EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed 8 Combined Steam and Radial Turbine Expander for Waste Heat Recovery (COSTART) Innovate UK £774,558 March 31, 2017 June 29, 2018 Closed 9 Novel high temperature steam transfer pipes EPSRC £399,708 Sept. 30, 2017 April 29, 2019 Closed 10 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC £0 Feb. 1, 2018 Feb. 28, 2022 Closed 11 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC, NERC £0 Feb. 1, 2018 Feb. 28, 2022 Closed 12 Zero Emission Diesel Engine Replacement Drive Train Innovate UK £116,852 Sept. 30, 2020 Dec. 31, 2020 Closed 13 Oxy-hybrid Power Cycle with Advanced Heat Recovery Network EPSRC £147,616 Feb. 24, 2014 Feb. 23, 2015 Closed 14 Zero-Emissions Super Efficient Hybrid Research Vessel Design for Plymouth Marine Laboratory Innovate UK £164,488 Aug. 31, 2021 March 30, 2022 Closed 15 IMPLANT - Advanced Materials and Manufacturing for Improved Power and Process Plant Performance Innovate UK £1,825,308 Jan. 1, 2020 March 30, 2023 Active 16 In-Situ Test of High Temperature Pipes in Nuclear Power Plant (UltraHotTest) Innovate UK £96,200 Nov. 1, 2016 Jan. 31, 2017 Closed 17 In-Situ Test of High Temperature Pipes in Nuclear Power Plant (UltraHotTest) Innovate UK £240,500 Nov. 1, 2016 Jan. 31, 2017 Closed 18 Evaluation of a large energy intensive site to detemine if centralised electricity generation and steam distribution is preferable to local generation EPSRC £1,279,344 Sept. 30, 2009 March 31, 2013 Closed 19 Evaluation of a large energy intensive site to detemine if centralised electricity generation and steam distribution is preferable to local generation EPSRC £3,198,360 Sept. 30, 2009 March 31, 2013 Closed 20 FANBOT (Fan Blade Off Testing) Innovate UK £33,516,650 Nov. 1, 2020 Oct. 31, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »