# Title Funder Funding Start End Status
1 Micro-CHP using steam ejector/water turbine (WaterGen) EPSRC
£297,574
Jan. 1, 2016 Dec. 31, 2016 Closed
2 Micro-CHP using steam ejector/water turbine (WaterGen) EPSRC
£743,935
Jan. 1, 2016 Dec. 31, 2016 Closed
3 Small Scale Biomass-Fired CHP System EPSRC
£269,950
Jan. 1, 2007 Oct. 31, 2008 Closed
4 Small Scale Biomass-Fired CHP System EPSRC
£674,875
Jan. 1, 2007 Oct. 31, 2008 Closed
5 Zero Emission Steam Velocity Assessment Innovate UK
£99,450
June 30, 2023 Sept. 30, 2023 Closed
6 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant Innovate UK
£1,275,538
April 30, 2016 April 29, 2019 Closed
7 Project Description for Measurement of In-Service Turbine Blade Clearance, and Transmission through the Casing Wall. EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
8 Combined Steam and Radial Turbine Expander for Waste Heat Recovery (COSTART) Innovate UK
£774,558
March 31, 2017 June 29, 2018 Closed
9 Novel high temperature steam transfer pipes EPSRC
£399,708
Sept. 30, 2017 April 29, 2019 Closed
10 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC
£0
Feb. 1, 2018 Feb. 28, 2022 Closed
11 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC, NERC
£0
Feb. 1, 2018 Feb. 28, 2022 Closed
12 Zero Emission Diesel Engine Replacement Drive Train Innovate UK
£116,852
Sept. 30, 2020 Dec. 31, 2020 Closed
13 Oxy-hybrid Power Cycle with Advanced Heat Recovery Network EPSRC
£147,616
Feb. 24, 2014 Feb. 23, 2015 Closed
14 Zero-Emissions Super Efficient Hybrid Research Vessel Design for Plymouth Marine Laboratory Innovate UK
£164,488
Aug. 31, 2021 March 30, 2022 Closed
15 IMPLANT - Advanced Materials and Manufacturing for Improved Power and Process Plant Performance Innovate UK
£1,825,308
Jan. 1, 2020 March 30, 2023 Active
16 In-Situ Test of High Temperature Pipes in Nuclear Power Plant (UltraHotTest) Innovate UK
£96,200
Nov. 1, 2016 Jan. 31, 2017 Closed
17 In-Situ Test of High Temperature Pipes in Nuclear Power Plant (UltraHotTest) Innovate UK
£240,500
Nov. 1, 2016 Jan. 31, 2017 Closed
18 Evaluation of a large energy intensive site to detemine if centralised electricity generation and steam distribution is preferable to local generation EPSRC
£1,279,344
Sept. 30, 2009 March 31, 2013 Closed
19 Evaluation of a large energy intensive site to detemine if centralised electricity generation and steam distribution is preferable to local generation EPSRC
£3,198,360
Sept. 30, 2009 March 31, 2013 Closed
20 FANBOT (Fan Blade Off Testing) Innovate UK
£33,516,650
Nov. 1, 2020 Oct. 31, 2024 Active
Reset