# Title Funder Funding Start End Status
81 Geothermal Power Generated from UK Granites (GWatt) NERC
£1,249,368
Jan. 2, 2019 June 30, 2023 Active
82 Geothermal Power Generated from UK Granites (GWatt) NERC
£1,302,924
Jan. 2, 2019 June 30, 2023 Active
83 Geothermal Power Generated from UK Granites (GWatt) NERC
£1,039,216
Jan. 2, 2019 June 30, 2023 Active
84 Geothermal Power Generated from UK Granites (GWatt) NERC
£2,598,040
Jan. 2, 2019 July 1, 2023 Closed
85 Geothermal Power Generated from UK Granites (GWatt) NERC
£3,123,420
Jan. 2, 2019 July 1, 2023 Closed
86 Geothermal Power Generated from UK Granites (GWatt) NERC
£2,172,706
Jan. 2, 2019 July 1, 2023 Closed
87 13TSB_ACT: Lobster Grower - Develop the technology to fast track the aquaculture potential for the European Lobster BBSRC
£72,094
April 30, 2014 March 30, 2016 Closed
88 The simultaneous evolution of seismicity and permeability within geological faults NERC
£899,310
Jan. 3, 2008 July 2, 2010 Closed
89 The simultaneous evolution of seismicity and permeability within geological faults NERC
£1,258,015
Sept. 2, 2007 Dec. 2, 2010 Closed
90 Using ferroelectric domain walls for active control of heat flow at the nanoscale UKRI
£1,925,604
Feb. 1, 2021 Jan. 31, 2025 Active
91 Using ferroelectric domain walls for active control of heat flow at the nanoscale FLF
£4,814,010
Feb. 1, 2021 Jan. 31, 2025 Active
92 Direct Numerical Simulation of Jets in Cross-Flow with Application to Turbine Blade Cooling EPSRC
£247,244
Feb. 1, 2006 Jan. 31, 2009 Closed
93 Modelling and optimisation for a coordinated interconnected multi-terminal DC transmission infrastructure for integration of offshore wind energy EPSRC
£0
Sept. 30, 2021 Sept. 29, 2024 Active
94 Modelling and optimisation for a coordinated interconnected multi-terminal DC transmission infrastructure for integration of offshore wind energy EPSRC
£0
Sept. 30, 2021 Sept. 30, 2024 Active
95 Boiling in Microchannels: integrated design of closed-loop cooling system for devices operating at high heat fluxes EPSRC
£2,095,660
April 30, 2013 Oct. 30, 2016 Closed
96 Zinc-Nickel Redox Flow Battery for Energy Storage EPSRC
£1,677,890
Nov. 15, 2016 May 12, 2020 Closed
97 Zinc-Nickel Redox Flow Battery for Energy Storage EPSRC
£4,194,725
Nov. 15, 2016 May 13, 2020 Closed
98 The effects of fluid flow on the transport properties of faults in Enhanced Geothermal Systems EPSRC
£0
Sept. 29, 2019 June 30, 2023 Closed
99 Lower Cost and Longer Life Flow Batteries for Grid Scale Energy Storage EPSRC
£1,881,376
June 29, 2014 June 28, 2017 Closed
100 Modelling and optimisation for a coordinated interconnected multi-terminal DC transmission infrastructure for integration of offshore wind energy EPSRC
£0
Sept. 27, 2020 Sept. 29, 2024 Active
Reset