Home Projects More like: Intelligent Blade Controlled Wind Turbine [Clear] # Title Funder Funding Start End Status 21 Offshore wind on-turbine electrical vessel charging system Innovate UK £10,033,955 Aug. 31, 2021 March 31, 2022 Closed 22 Evaluating Novel Wind Energy Designs EPSRC £0 Sept. 23, 2018 March 30, 2022 Active 23 Evaluating Novel Wind Energy Designs EPSRC £0 Sept. 30, 2018 March 31, 2022 Closed 24 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 25 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 30, 2025 Active 26 Six Axis Monitoring (SAM) local position reference system for dynamic positioning for safer offshore wind installation, servicing and maintenance operations. Innovate UK £491,992 Sept. 30, 2020 March 30, 2022 Closed 27 Six Axis Monitoring (SAM) local position reference system for dynamic positioning for safer offshore wind installation, servicing and maintenance operations. Innovate UK £1,229,980 Sept. 30, 2020 March 31, 2022 Closed 28 Engineered textile blade with actively controlled surface/profile Innovate UK £231,556 April 30, 2015 Jan. 31, 2016 Closed 29 Engineered textile blade with actively controlled surface/profile Innovate UK £578,890 April 30, 2015 Jan. 31, 2016 Closed 30 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK £9,965,976 March 31, 2010 Dec. 31, 2015 Closed 31 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK £18,543,684 March 31, 2010 Dec. 31, 2015 Closed 32 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK £30,906,140 March 31, 2010 Dec. 31, 2015 Closed 33 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK £16,609,960 March 31, 2010 Dec. 31, 2015 Closed 34 Platforms for tidal energy convertors Innovate UK £141,802 Sept. 30, 2016 Dec. 31, 2017 Closed 35 EchoBolt Advanced Fastener Inspection for Wind Turbines Innovate UK £591,676 Sept. 30, 2019 March 30, 2021 Closed 36 EchoBolt Advanced Fastener Inspection for Wind Turbines Innovate UK £1,479,190 Sept. 30, 2019 March 31, 2021 Closed 37 Methodologies and simulation tools to support Operations and Maintenance (O&M) strategies and lifetime reliability assessment of Offshore Renewable En EPSRC £0 Aug. 31, 2019 Aug. 30, 2023 Active 38 Methodologies and simulation tools to support Operations and Maintenance (O&M) strategies and lifetime reliability assessment of Offshore Renewable En EPSRC £0 Aug. 31, 2019 Aug. 31, 2023 Closed 39 Self-sensing wind turbine composite blades for structural health monitoring (SMARTBLADE) Innovate UK £826,836 March 1, 2018 Feb. 29, 2020 Closed 40 Self-sensing wind turbine composite blades for structural health monitoring (SMARTBLADE) Innovate UK £2,160,660 March 1, 2018 Feb. 29, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »