Home Projects More like: Variable Pitch Vertical Axis Wind Turbine [Clear] # Title Funder Funding Start End Status 41 Wind blade design for disassembly EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 42 Wind blade design for disassembly EPSRC £0 Sept. 19, 2021 Sept. 29, 2025 Active 43 Intelligent Blade Controlled Wind Turbine Innovate UK £419,206 Dec. 1, 2019 March 30, 2021 Closed 44 Intelligent Blade Controlled Wind Turbine Innovate UK £1,048,015 Dec. 1, 2019 March 31, 2021 Closed 45 EPICTidal: Establishing the performance implications of employing lower cost methods for the manufacture of large scale tidal turbine rotors Innovate UK £139,902 March 31, 2017 March 30, 2018 Closed 46 Designcraft Tidal Turbine Blade Concept Innovate UK £192,864 Jan. 1, 2012 Sept. 29, 2012 Closed 47 Designcraft Tidal Turbine Blade Concept Innovate UK £482,160 Jan. 1, 2012 Sept. 30, 2012 Closed 48 Aerodynamic blockage and tip-loss effects in a multi-rotor vertical axis wind turbine system EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 49 High performance pultrusion for advanced composites (HIPPAC) Innovate UK £590,322 Feb. 1, 2020 June 29, 2021 Closed 50 High performance pultrusion for advanced composites (HIPPAC) Innovate UK £1,475,805 Feb. 1, 2020 June 30, 2021 Closed 51 Development of in situ repair of damaged wind turbine blades Innovate UK £241,392 May 31, 2010 Nov. 30, 2011 Closed 52 Development of in situ repair of damaged wind turbine blades Innovate UK £603,480 May 31, 2010 Nov. 30, 2011 Closed 53 Enabling technology for robotic inspection and maintenance of offshore wind turbine blades Innovate UK £117,252 Dec. 1, 2017 Aug. 30, 2018 Closed 54 Wind turbine wake analysis and modelling EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 55 Modularised Platform Technology of Twin Axis PECM Machine Tool Innovate UK £50,000 July 31, 2014 Jan. 31, 2015 Closed 56 Scale-resolving simulations of atmosphere / wind farm interactions NERC £0 Sept. 30, 2021 March 30, 2025 Active 57 Scale-resolving simulations of atmosphere / wind farm interactions NERC £0 Sept. 30, 2021 March 31, 2025 Active 58 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK £5,133,270 June 30, 2022 June 30, 2024 Active 59 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK £1,026,654 June 30, 2022 June 29, 2024 Active 60 Modelling Gas Turbine Blade Degradation in a High Fidelity Digital Twin EPSRC £0 June 7, 2020 June 6, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »