# Title Funder Funding Start End Status
1 Damping in Composite Fan Blades EPSRC
£0
Dec. 5, 2017 May 6, 2022 Active
2 Multiscale Modelling of Metal-Semiconductor Contacts for the Next Generation of Nanoscale Transistors EPSRC
£585,700
June 29, 2011 Sept. 28, 2014 Closed
3 Multiscale Modelling of Metal-Semiconductor Contacts for the Next Generation of Nanoscale Transistors EPSRC
£579,970
May 31, 2011 Oct. 31, 2014 Closed
4 Novel highly aerodynamically efficient wing concepts to enhance stability and flight performance characteristics EPSRC
£0
Sept. 19, 2021 March 30, 2025 Active
5 Novel highly aerodynamically efficient wing concepts to enhance stability and flight performance characteristics EPSRC
£0
Sept. 30, 2021 March 31, 2025 Active
6 Offshore Wind Turbine Foundation EPSRC
£0
Sept. 30, 2016 Sept. 29, 2020 Closed
7 Offshore Wind Turbine Foundation EPSRC
£0
Sept. 30, 2016 Sept. 30, 2020 Closed
8 The Multi-float WaveSub Wave Energy Converter EPSRC
£101,106
Sept. 30, 2016 Sept. 29, 2017 Closed
9 The Multi-float WaveSub Wave Energy Converter EPSRC
£252,765
Sept. 30, 2016 Sept. 30, 2017 Closed
10 ICC: A Combined Computational and Spectroscopic Study of Structure and Charge Transfer Dynamics of Ionic Liquids in Heterogeneous Environments EPSRC
£577,672
April 30, 2013 April 29, 2016 Closed
11 Frictional damping effects on structural dynamics EPSRC
£0
Jan. 1, 2018 Dec. 31, 2021 Closed
12 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£202,124
May 31, 2018 June 29, 2020 Closed
13 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£505,310
May 31, 2018 June 30, 2020 Closed
14 Micromechanical assessment of structural batteries EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
15 Structural Health Monitoring for Rotating Machinery based on Operational Modal Analysis and Artificial Intelligence EPSRC
£0
Sept. 30, 2018 March 30, 2022 Active
16 Simulation of kinetic effects in turbulence and collisionless shocks STFC
£1,077,215
March 1, 2008 Feb. 28, 2010 Closed
17 A Predictive Approach to Modelling Frictional Joint Performance (PAMFJP) EPSRC
£1,142,751
Jan. 2, 2008 Jan. 1, 2012 Closed
18 A Predictive Approach to Modelling Frictional Joint Performance (PAMFJP) EPSRC
£861,138
Sept. 30, 2007 Sept. 29, 2011 Closed
19 Carbon/biocomposite hybrid vehicle structures for reduced weight, cost and environmental impact (CARBIO) EPSRC
£592,225
Jan. 14, 2014 Jan. 13, 2016 Closed
20 Vacancy Engineering in Anode Materials for High-Power K-Ion Batteries EPSRC
£779,946
March 3, 2021 March 2, 2024 Active
Reset