# Title Funder Funding Start End Status
61 Wind turbine wake analysis and modelling EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
62 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK
£1,026,654
June 30, 2022 June 29, 2024 Active
63 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK
£5,133,270
June 30, 2022 June 30, 2024 Active
64 Modelling Gas Turbine Blade Degradation in a High Fidelity Digital Twin EPSRC
£0
June 7, 2020 June 6, 2024 Active
65 Development of an advanced Vertical Axis Wind Turbine prototype capable of grid parity by X-Wind Power Limited Innovate UK
£130,906
April 30, 2012 June 29, 2013 Closed
66 Development of an advanced Vertical Axis Wind Turbine prototype capable of grid parity by X-Wind Power Limited Innovate UK
£327,265
April 30, 2012 June 30, 2013 Closed
67 A numerical study on aerofoil trailing edge noise and its reduction methods for the next-generation wind turbines EPSRC
£0
April 29, 2018 April 29, 2021 Closed
68 Tidal Blade Design EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
69 An investigation into combined film and internal cooling of turbine blades EPSRC
£202,340
March 31, 2018 March 30, 2021 Closed
70 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK
£2,943,394
Jan. 1, 2019 Dec. 31, 2020 Closed
71 Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade Innovate UK
£7,287,715
Jan. 1, 2019 Dec. 31, 2020 Closed
72 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC
£1,802,754
Feb. 1, 2012 July 30, 2015 Closed
73 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC
£4,506,885
Feb. 1, 2012 July 31, 2015 Closed
74 Feasibility of an Innovative Methodology for Testing Marine Current Turbines in Unsteady Flow EPSRC
£69,958
March 31, 2008 June 29, 2009 Closed
75 Feasibility of an Innovative Methodology for Testing Marine Current Turbines in Unsteady Flow EPSRC
£266,564
March 31, 2008 June 29, 2009 Closed
76 Feasibility of an Innovative Methodology for Testing Marine Current Turbines in Unsteady Flow EPSRC
£666,410
March 31, 2008 June 30, 2009 Closed
77 Engineered textile blade with actively controlled surface/profile Innovate UK
£231,556
April 30, 2015 Jan. 31, 2016 Closed
78 Engineered textile blade with actively controlled surface/profile Innovate UK
£578,890
April 30, 2015 Jan. 31, 2016 Closed
79 Certifying Wind Turbine Blade Derived Products Innovate UK
£49,802
Nov. 1, 2022 April 29, 2023 Active
80 Fluid-structure coupling for the stability and energy performance of a wind turbine with hyper- flexible blades, under different hydrodynamic flow reg EPSRC
£0
Oct. 17, 2021 Oct. 17, 2024 Active
Reset