Home Projects More like: High Fidelity Modelling of Wind Turbine Main-Bearing Operational Loads [Clear] # Title Funder Funding Start End Status 1 Impacts of Atmospheric Turbulence on Wind Turbine Main-Bearing Function and Failures EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 2 Impacts of Atmospheric Turbulence on Wind Turbine Main-Bearing Function and Failures EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 3 NONLINEAR DYNAMIC ANALYSIS OF OIL-FREE TURBOMACHINERY EPSRC £579,322 July 17, 2011 July 16, 2014 Closed 4 A General Approach to the Analysis of Fatigue Cracks in Lubricated Contacts EPSRC £410,246 Sept. 10, 2007 Sept. 9, 2010 Closed 5 Morphing-Blades: New-Concept Turbine Blades for Unsteady Load Mitigation EPSRC £1,819,700 June 30, 2021 June 29, 2024 Active 6 Morphing-Blades: New-Concept Turbine Blades for Unsteady Load Mitigation EPSRC £4,549,250 June 30, 2021 June 30, 2024 Active 7 Dynamic Loadings on Turbines in a Tidal Array (DyLoTTA) EPSRC £1,607,090 June 30, 2016 March 30, 2020 Closed 8 DURABILITY MODELLING OF COMPOSITE STRUCTURES WITH ARBITRARY LAY-UP USING STANDARDIZED TESTING AND ARTIFICIAL INTELLIGENCE (D-STANDART) Horizon Europe Guarantee £1,129,345 Jan. 1, 2023 Dec. 31, 2025 Active 9 DURABILITY MODELLING OF COMPOSITE STRUCTURES WITH ARBITRARY LAY-UP USING STANDARDIZED TESTING AND ARTIFICIAL INTELLIGENCE (D-STANDART) Horizon Europe Guarantee £3,659,980 Jan. 1, 2023 Dec. 31, 2025 Active 10 DURABILITY MODELLING OF COMPOSITE STRUCTURES WITH ARBITRARY LAY-UP USING STANDARDIZED TESTING AND ARTIFICIAL INTELLIGENCE Horizon Europe Guarantee £3,114,330 Jan. 1, 2023 Dec. 31, 2025 Active 11 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC £0 Sept. 25, 2019 March 30, 2023 Active 12 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed 13 Quarter Scale Testing of the Intelligent Mooring System for Floating Offshore Wind Platforms Innovate UK £819,868 April 30, 2021 Feb. 28, 2023 Active 14 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £1,589,160 Sept. 30, 2021 Sept. 29, 2024 Active 15 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £3,972,900 Sept. 30, 2021 Sept. 30, 2024 Active 16 Development of a smart system to enable calibration of bearing condition monitoring Innovate UK £581,843 Sept. 30, 2021 Jan. 31, 2022 Closed 17 Understanding intermediate temperature fatigue crack growth in single crystal Ni-based superalloys EPSRC £0 Sept. 29, 2021 Sept. 29, 2025 Active 18 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC £338,246 May 28, 2019 Dec. 31, 2021 Closed 19 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC £845,615 May 28, 2019 Dec. 31, 2021 Closed 20 ENHANCING AEROMECHANICAL ANALYSIS AND DESIGN CAPABILITIES OF WIND TURBINE ROTORS BY MEANS OF NONLINEAR FREQUENCY-DOMAIN COMPUTATIONAL FLUID DYNAMICS EPSRC £604,084 Sept. 15, 2008 Sept. 14, 2011 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »