Home Projects More like: LUSH (Lean UltraFan 2 Stage High Pressure Turbine) [Clear] # Title Funder Funding Start End Status 61 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £1,002,235 Oct. 2, 2016 Oct. 2, 2018 Closed 62 Offshore Infrastructure Robotic Inspection System (OSIRIS) Innovate UK £188,880 Nov. 1, 2017 Sept. 29, 2018 Closed 63 Investigations of HTGR Reactor Building Response to Break in Primary Coolant Boundary EPSRC £838,746 Jan. 1, 2020 Dec. 31, 2022 Active 64 Investigations of HTGR Reactor Building Response to Break in Primary Coolant Boundary EPSRC £2,096,865 Jan. 1, 2020 Dec. 31, 2022 Closed 65 SAMBA - Smart Automotive Managed Battery Algorithms Innovate UK £233,414 July 31, 2018 July 30, 2019 Closed 66 SAMBA - Smart Automotive Managed Battery Algorithms ISCF £583,535 July 31, 2018 July 31, 2019 Closed 67 An Information Theory Inspired Study of Memristor Devices and their Potential Use in Neuromorphic Circuits EPSRC £0 Sept. 30, 2019 June 29, 2023 Active 68 Hybrid Turbocharger Innovate UK £289,580 Nov. 1, 2009 April 29, 2012 Closed 69 Small Scale Anaerobic Digestion - Proof of Market Study Innovate UK £75,000 Sept. 30, 2013 March 30, 2014 Closed 70 Small Scale Anaerobic Digestion - Proof of Market Study Innovate UK £125,000 Sept. 30, 2013 March 31, 2014 Closed 71 SilkE Hybrid Propulsion System Innovate UK £299,984 Nov. 1, 2020 July 30, 2022 Closed 72 Reducing Vehicle Carbon Emissions through Development of a Compact, Efficient, and Intelligent Powertrain Innovate UK £7,767,842 March 31, 2017 March 30, 2021 Closed 73 Hydrogen-empowered Hydro-Electric Grids (HyHEG) Innovate UK £5,939,175 March 1, 2023 Feb. 28, 2025 Active 74 Smart Transient Gas Distribution Network Operations Advisor Platform Innovate UK £488,958 Aug. 31, 2018 Aug. 30, 2019 Closed 75 Smart Transient Gas Distribution Network Operations Advisor Platform Innovate UK £1,222,395 Aug. 31, 2018 Aug. 31, 2019 Closed 76 External Wall Insulation with an Integrated Solar Absorber Unit Innovate UK £36,062 Aug. 31, 2012 Jan. 31, 2013 Closed 77 External Wall Insulation with an Integrated Solar Absorber Unit Innovate UK £90,155 Aug. 31, 2012 Jan. 31, 2013 Closed 78 Thermally Driven Heat Pump Based on an Integrated Thermodynamic Cycle for Low Carbon Domestic Heating (Therma-Pump) EPSRC £1,426,066 Sept. 30, 2016 Dec. 31, 2019 Closed 79 Thermally Driven Heat Pump Based on an Integrated Thermodynamic Cycle for Low Carbon Domestic Heating (Therma-Pump) EPSRC £3,565,165 Sept. 30, 2016 Dec. 31, 2019 Closed 80 Soho Food Waste Energy Innovate UK £58,702 July 31, 2013 Oct. 31, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »