61 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK
£1,151,425
Sept. 30, 2010 March 31, 2013 Closed
62 Social-economic-environmental trade-offs in managing the Land-River-Interface NERC
£1,215,925
Feb. 13, 2019 Feb. 12, 2022 Closed
63 The Net Zero NW Cluster Plan Innovate UK
£729,483
Jan. 1, 2021 Dec. 31, 2022 Active
64 The Net Zero NW Cluster Plan ISCF
£1,090,872
Jan. 1, 2021 March 31, 2023 Closed
65 Floating Instream and Solar (FITS) Power Plant Innovate UK
£1,991,302
March 31, 2020 March 30, 2022 Closed
66 Floating Instream and Solar (FITS) Power Plant Innovate UK
£5,104,595
March 31, 2020 March 31, 2022 Closed
67 Modular Tide Generators Limited Innovate UK
£1,727,336
Sept. 30, 2017 March 31, 2019 Closed
68 Imagining the measure of change: art, science and the estuary community AHRC
£68,692
Jan. 1, 2020 Aug. 30, 2022 Active
69 EPSRC Centre for Doctoral Training in Fluid Dynamics at Leeds EPSRC
£7,882,534
March 31, 2014 July 30, 2023 Active
70 TidAl Range schemes as configurable Grid-scale Energy sTorage facilities (TARGET) EPSRC
£1,158,210
June 30, 2022 June 29, 2024 Active
71 TidAl Range schemes as configurable Grid-scale Energy sTorage facilities (TARGET) EPSRC
£5,791,050
Jan. 1, 2023 Dec. 31, 2024 Active
72 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC
£3,231,690
Oct. 2, 2022 Oct. 1, 2025 Active
73 REAL: River, Estuary and Coastal resilient infrastructure testing flume EPSRC
£16,158,450
Oct. 2, 2022 Oct. 2, 2025 Active
74 KE Fellowship: Delivering Multifunctional Natural Capital Approaches for Future Coasts NERC
£384,120
July 30, 2021 March 30, 2025 Active
75 HydroWheel Product and Business Case Development Innovate UK
£1,024,440
March 31, 2023 March 31, 2024 Active
76 Structural Efficiency and Multi-Functionality of Well-Behaved Nonlinear Composite Structures EPSRC
£1,732,582
March 31, 2015 Aug. 30, 2020 Closed
77 Micro Autonomous Surface Vessel (Micro-ASV) for inland waterway surveying ISCF
£474,400
Jan. 1, 2018 Sept. 30, 2018 Closed
78 Land Ocean Carbon Transfer (1-year extension) NERC
£272,799
March 31, 2021 March 30, 2022 Closed
79 Land Ocean Carbon Transfer (1-year extension) NERC
£256,776
March 31, 2021 March 30, 2022 Closed
80 Land Ocean Carbon Transfer (1-year extension) NERC
£54,362
March 31, 2021 March 30, 2022 Closed