# Title Funder Funding Start End Status
21 Buildings of 2050: What can be achieved with zero-carbon structures? EPSRC
£0
March 27, 2022 Sept. 29, 2025 Active
22 Buildings of 2050: What can be achieved with zero-carbon structures? EPSRC
£0
March 31, 2022 Sept. 30, 2025 Active
23 Sustainable manufacturing of circular economy elastomer products EPSRC
£2,494,810
Feb. 1, 2022 July 16, 2025 Active
24 HempSil Board - a low carbon breathable insulating plasterboard Innovate UK
£271,665
July 31, 2023 Jan. 31, 2024 Active
25 Studies of coatings, lifetime and circular economy of resin-wood composites EPSRC
£0
Sept. 30, 2019 July 30, 2021 Closed
26 Studies of coatings, lifetime and circular economy of resin-wood composites EPSRC
£0
Sept. 30, 2019 July 31, 2021 Closed
27 Sustainable Biofuels and Chemicals from Waste BBSRC
£0
Sept. 30, 2015 Sept. 29, 2019 Closed
28 Sustainable Biofuels and Chemicals from Waste BBSRC
£0
Sept. 30, 2015 Sept. 30, 2019 Closed
29 Innovative Wood Composite Poles Innovate UK
£235,894
April 30, 2016 March 30, 2017 Closed
30 Innovative Wood Composite Poles Innovate UK
£589,735
April 30, 2016 March 31, 2017 Closed
31 Electrostatic capture of carbon dust from tyres Innovate UK
£239,916
Jan. 1, 2021 March 30, 2021 Closed
32 BBSRC Centre For Sustainable Bioenergy (BSBEC): Programme 4: Lignocellulosic Conversion To Bioethanol (LACE) BBSRC
£10,698,900
April 30, 2009 March 30, 2015 Closed
33 BBSRC Centre For Sustainable Bioenergy (BSBEC): Programme 4: Lignocellulosic Conversion To Bioethanol (LACE) BBSRC
£26,747,250
April 30, 2009 March 31, 2015 Closed
34 Green Repolymerised Compounds Innovate UK
£433,672
Aug. 31, 2008 Feb. 29, 2012 Closed
35 Green Repolymerised Compounds Innovate UK
£1,084,180
Aug. 31, 2008 Feb. 29, 2012 Closed
36 Digital design of building structures for optimised cost and carbon performance Innovate UK
£417,866
Sept. 30, 2018 Feb. 28, 2021 Closed
37 SoFo (ScOre FOllow on Project) EPSRC
£379,142
March 31, 2012 March 31, 2013 Closed
38 SoFo (ScOre FOllow on Project) EPSRC
£947,855
March 31, 2012 March 31, 2013 Closed
39 Microwave assisted pretreatment of lignocellulosic residues for better performance as solid fuels in fluidzsed bed (FB) energy production technologies EPSRC
£199,556
Jan. 1, 2018 March 30, 2021 Closed
40 Microwave assisted pretreatment of lignocellulosic residues for better performance as solid fuels in fluidzsed bed (FB) energy production technologies EPSRC
£498,890
Jan. 1, 2018 March 31, 2021 Closed
Reset