# Title Funder Funding Start End Status
1 SPECIFIC IKC Phase 2 EPSRC
£14,988,165
March 31, 2016 March 31, 2025 Active
2 The Active Building Centre ISCF
£179,737,135
Sept. 2, 2018 May 7, 2020 Closed
3 The Active Building Centre EPSRC
£71,894,854
Sept. 2, 2018 May 6, 2020 Closed
4 EPSRC and SFI Centre for Doctoral Training in Energy Resilience and the Built Environment EPSRC
£11,473,301
Sept. 30, 2019 March 30, 2028 Active
5 EPSRC and SFI Centre for Doctoral Training in Energy Resilience and the Built Environment EPSRC
£29,281,480
Sept. 30, 2019 March 31, 2028 Active
6 Build-up for Net Zero (BUNZ) Innovate UK
£119,988
Sept. 30, 2020 Dec. 31, 2020 Closed
7 SPECIFIC Tranche 2: Heat, Water, PV and Bio-inspiration EPSRC
£8,134,890
May 31, 2013 May 31, 2016 Closed
8 The University of Birmingham - Equipment Account EPSRC
£13,454,774
Dec. 19, 2013 Oct. 31, 2017 Closed
9 The University of Birmingham - Equipment Account EPSRC
£33,636,935
Dec. 19, 2013 Oct. 31, 2017 Closed
10 Smart Energy Research Lab EPSRC
£11,877,706
Aug. 27, 2017 Aug. 26, 2023 Active
11 Smart Energy Research Lab EPSRC
£29,694,265
Aug. 27, 2017 Aug. 28, 2023 Closed
12 Magnetic Research Fusion Programme 2017-2022 EPSRC
£658,790,725
March 31, 2017 May 9, 2019 Closed
13 Magnetic Research Fusion Programme 2019-2022 EPSRC
£216,158,010
March 31, 2019 March 31, 2022 Closed
14 Sustainable Product Engineering Centre for Innovative Functional Industrial Coatings - SPECIFIC EPSRC
£10,024,210
March 31, 2011 July 30, 2016 Closed
15 Sustainable Product Engineering Centre for Innovative Functional Industrial Coatings - SPECIFIC EPSRC
£25,060,525
March 31, 2011 July 31, 2016 Closed
16 RCUK CENTRE for ENERGY EPIDEMIOLOGY (CEE): the study of energy demand in a population. EPSRC
£11,491,710
April 30, 2013 Oct. 31, 2018 Closed
17 RCUK CENTRE for ENERGY EPIDEMIOLOGY (CEE): the study of energy demand in a population. EPSRC
£28,729,275
April 30, 2013 Oct. 31, 2018 Closed
18 SPECIFIC Tranche 1: Buildings as Power Stations EPSRC
£13,959,335
June 30, 2012 June 30, 2016 Closed
19 SPECIFIC Tranche 1: Buildings as Power Stations EPSRC
£5,583,734
June 30, 2012 June 29, 2016 Closed
20 Thermochemical energy storage using a closed cycle (ThermoStore) EPSRC
£1,045,512
Aug. 31, 2020 Aug. 30, 2023 Active
Reset