Home Projects More like: Novel algorithms for solar-powered in-road sensors to measure speed and classify vehicles to inform intelligent traffic management decisions [Clear] # Title Funder Funding Start End Status 41 Investigation of technical implications of evolving from Microgrids to Peer to EPSRC £0 Sept. 30, 2019 Sept. 29, 2022 Active 42 Investigation of technical implications of evolving from Microgrids to Peer to EPSRC £0 Sept. 30, 2019 Sept. 30, 2022 Closed 43 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC £338,246 May 28, 2019 Dec. 31, 2021 Closed 44 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC £845,615 May 28, 2019 Dec. 31, 2021 Closed 45 Noise and Vibration Data Compressor (NVCOMP) - embeddable health monitoring solution to assist in the capture and replay of events to identify deterioration / damage in nuclear plant Innovate UK £2,826,610 April 30, 2015 Oct. 31, 2018 Closed 46 KCN: Knowledge Centric Networking EPSRC £4,914,570 Dec. 31, 2014 June 30, 2018 Closed 47 Intelligent and Integrated Condition Monitoring of Distributed Generation Systems EPSRC £198,046 Jan. 16, 2012 May 14, 2013 Closed 48 Intelligent and Integrated Condition Monitoring of Distributed Generation Systems EPSRC £495,115 Jan. 16, 2012 May 15, 2013 Closed 49 High density temperature measurements within the urban environment (HiTemp) NERC £1,220,490 April 30, 2011 Oct. 31, 2014 Closed 50 High density temperature measurements within the urban environment (HiTemp) NERC £22,924 July 31, 2013 April 29, 2014 Closed 51 High density temperature measurements within the urban environment (HiTemp) NERC £81,646 April 30, 2011 July 31, 2013 Closed 52 High density temperature measurements within the urban environment (HiTemp) NERC £204,115 April 30, 2011 Aug. 1, 2013 Closed 53 High density temperature measurements within the urban environment (HiTemp) NERC £57,310 July 31, 2013 April 30, 2014 Closed 54 High density temperature measurements within the urban environment (HiTemp) NERC £3,051,225 April 30, 2011 Oct. 31, 2014 Closed 55 Accelerated Real-Time Information Extraction System (ARIES) EPSRC £505,046 Sept. 30, 2012 Sept. 29, 2013 Closed 56 Accelerated Real-Time Information Extraction System (ARIES) EPSRC £1,262,615 Sept. 30, 2012 Sept. 30, 2013 Closed 57 Control For Energy and Sustainability EPSRC £11,072,988 Sept. 30, 2009 March 30, 2015 Closed 58 Control For Energy and Sustainability EPSRC £27,682,470 Sept. 30, 2009 March 31, 2015 Closed 59 Leveraging the Google Cloud to Estimate Individual Level CO2 Emissions Linked to the School Commute ESRC £477,765 May 30, 2013 Aug. 25, 2014 Closed 60 Developing Scalable Smart Grid Infrastructure to Enable Secure Transmission System Control EPSRC £1,341,844 March 1, 2013 Feb. 29, 2016 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »