# Title Funder Funding Start End Status
21 Design Toolbox for Energy Efficiency in the Process Industry EPSRC
£970,108
Sept. 30, 2009 Sept. 29, 2013 Closed
22 Design Toolbox for Energy Efficiency in the Process Industry EPSRC
£2,425,270
Sept. 30, 2009 Sept. 30, 2013 Closed
23 H2: Absolute zero-carbon propulsion systems EPSRC
£860,306
March 1, 2022 Feb. 28, 2025 Active
24 H2: Absolute zero-carbon propulsion systems EPSRC
£2,150,765
Aug. 31, 2022 Feb. 28, 2025 Active
25 Governance of energy and transport infrastructures and services for wellbeing and planetary boundaries EPSRC
£0
Sept. 30, 2022 March 30, 2026 Active
26 Superconducting Ferromagnetic Metamaterials Enabling the Development of Resilient High Voltage / High Current Transmission Systems EPSRC
£0
Sept. 27, 2020 March 31, 2024 Active
27 Superconducting Ferromagnetic Metamaterials Enabling the Development of Resilient High Voltage / High Current Transmission Systems EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
28 Interface and Network Infrastructure to Support EV Participation in Smart Grids EPSRC
£1,881,776
June 30, 2013 May 30, 2017 Closed
29 Interface and Network Infrastructure to Support EV Participation in Smart Grids EPSRC
£4,704,440
June 30, 2013 May 31, 2017 Closed
30 GCRF_NF55 Fast-track vaccine cold-chain assessment and design for mass scale COVID-19 vaccination in Bangladesh (VaCoBD) EPSRC
£1,059,186
Aug. 13, 2020 April 29, 2022 Closed
31 GCRF_NF55 Fast-track vaccine cold-chain assessment and design for mass scale COVID-19 vaccination in Bangladesh (VaCoBD) GCRF
£2,647,965
Aug. 13, 2020 March 31, 2022 Closed
32 DESIGNING GOLD CATALYSTS FOR THE UTILISATION OF BIO-RENEWABLE FEEDSTOCKS EPSRC
£666,034
Sept. 30, 2007 Sept. 29, 2010 Closed
33 DESIGNING GOLD CATALYSTS FOR THE UTILISATION OF BIO-RENEWABLE FEEDSTOCKS EPSRC
£232,038
Sept. 30, 2007 Sept. 29, 2010 Closed
34 DESIGNING GOLD CATALYSTS FOR THE UTILISATION OF BIO-RENEWABLE FEEDSTOCKS EPSRC
£580,095
Sept. 30, 2007 Sept. 30, 2010 Closed
35 DESIGNING GOLD CATALYSTS FOR THE UTILISATION OF BIO-RENEWABLE FEEDSTOCKS EPSRC
£1,665,085
Sept. 30, 2007 Sept. 30, 2010 Closed
36 New Imaging Systems for Advanced Non-Destructive Evaluation EPSRC
£5,053,240
Aug. 31, 2009 Aug. 31, 2013 Closed
37 Xylan arabinosyl transferases: identification and characterisation of their role in determining properties of grass cell walls BBSRC
£1,295,788
April 14, 2013 Feb. 28, 2018 Closed
38 Identification of xylan arabinosyl transferases and their role in determining xylan structural and cross-linking properties within grass cell walls BBSRC
£975,718
March 1, 2013 Feb. 28, 2018 Closed
39 Xylan arabinosyl transferases: identification and characterisation of their role in determining properties of grass cell walls BBSRC
£3,239,470
April 14, 2013 Feb. 28, 2018 Closed
40 FiLAment Winding multi-nozzLE, traversing winding head for enabling production of composite high-preSSure vessels (FLAWLESS) Innovate UK
£49,943
Nov. 1, 2022 April 29, 2023 Active
Reset