Home Projects More like: REcyclable MArine Structure Towards Emission Reduction (REMASTER) [Clear] # Title Funder Funding Start End Status 1 REcyclable MArine Structure Towards Emission Reduction (REMASTER) Innovate UK £949,860 Aug. 31, 2021 March 31, 2022 Closed 2 Fibre Reinforced Thermoplastic Tape Development Cell EPSRC £8,931,800 Sept. 30, 2023 March 31, 2027 Active 3 Composites Application to Propulsion Systems for Upscaling and Low Emissions (CAPSULE) Innovate UK £357,594 Aug. 31, 2021 March 30, 2022 Closed 4 Low Cost Durable Thermoplastic Hydrogen Storage Tanks (DuraStor) Innovate UK £4,351,065 Sept. 30, 2009 Jan. 31, 2014 Closed 5 Scale-up and commercialization of an innovative forming technology for low-cost production of super-light automotive structural parts (SECA) Innovate UK £258,051 June 30, 2022 Dec. 31, 2023 Active 6 Enhanced Characterisation and Simulation Methods for Thermoplastic Overmoulding - ENACT Innovate UK £577,604 March 1, 2020 Feb. 28, 2022 Closed 7 High Efficiency Controllable Pitch Propeller Innovate UK £367,804 Aug. 31, 2021 March 30, 2022 Closed 8 Re-usable net-zero carbon structures ISCF £981,485 June 30, 2020 Dec. 31, 2021 Closed 9 Northern Ireland Green Seas Innovate UK £796,194 Aug. 31, 2021 March 30, 2022 Closed 10 Northern Ireland Green Seas Innovate UK £1,990,485 Aug. 31, 2021 March 31, 2022 Closed 11 Design of novel, additively manufactured cellular lattice supported composite structures using topology optimisation EPSRC £0 Sept. 30, 2019 Jan. 31, 2024 Active 12 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 13 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 14 High Volume Manufacture and Inspection Processes for Composite Pipes Innovate UK £1,415,018 June 30, 2019 June 29, 2021 Closed 15 Laser Manufacturing: Fit for the Future UKRI £2,916,130 Oct. 17, 2021 July 30, 2026 Active 16 Laser Manufacturing: Fit for the Future FLF £7,290,325 Oct. 17, 2021 July 31, 2026 Active 17 Optimisation of large concrete DfMA structures for the Nuclear Industry EPSRC £1,335,485 July 4, 2013 July 4, 2016 Closed 18 Offshore wind on-turbine electrical vessel charging system Innovate UK £4,013,582 Aug. 31, 2021 March 30, 2022 Closed 19 Offshore wind on-turbine electrical vessel charging system Innovate UK £10,033,955 Aug. 31, 2021 March 31, 2022 Closed 20 Flash Sintering of Composite Ceramic Materials and Structures EPSRC £388,918 July 31, 2018 Dec. 31, 2022 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »