Home Projects More like: Real time control of gasifiers to increase tolerance to biomass variety and reduce emissions [Clear] # Title Funder Funding Start End Status 41 Systems biology of the butanol-producing Clostridium acetobutylicum: new source of biofuel and chemicals/COSMIC2 BBSRC £461,694 March 31, 2010 Sept. 29, 2013 Closed 42 Systems biology of the butanol-producing Clostridium acetobutylicum: new source of biofuel and chemicals/COSMIC2 BBSRC £1,154,235 March 31, 2010 Sept. 30, 2013 Closed 43 Systems biology of the butanol-producing Clostridium acetobutylicum: new source of biofuel and chemicals/COSMIC2 BBSRC £2,263,470 Sept. 30, 2010 Dec. 31, 2013 Closed 44 MacroBioCrude: Developing an Integrated Supply and Processing Pipeline for the Sustained Production of Ensiled Macroalgae-derived Hydrocarbon Fuels EPSRC £3,108,304 Feb. 1, 2013 Sept. 29, 2018 Closed 45 MacroBioCrude: Developing an Integrated Supply and Processing Pipeline for the Sustained Production of Ensiled Macroalgae-derived Hydrocarbon Fuels EPSRC £7,770,760 Feb. 1, 2013 Sept. 30, 2018 Closed 46 NEWTON SEA: Valorisation of agricultural wastes in the Thai rural economy for bioenergy production, nutrient recycling and water pollution control Newton Fund £360,075 Feb. 13, 2017 Aug. 12, 2018 Closed 47 Uncovering Fundamental Mechanisms to Enable Sustainable Steel Manufacturing EPSRC £2,320,158 March 31, 2016 March 30, 2022 Closed 48 An advanced cookstove intervention to prevent pneumonia in children under 5 years old in Malawi: a cluster randomised controlled trial MRC £5,394,970 Dec. 1, 2012 May 30, 2017 Closed 49 An advanced cookstove intervention to prevent pneumonia in children under 5 years old in Malawi: a cluster randomised controlled trial MRC £13,487,425 Dec. 1, 2012 May 31, 2017 Closed 50 From atoms to plant: co-production of green transport fuel and levoglucosan from waste biomass EPSRC £155,328 June 30, 2019 Sept. 13, 2020 Closed 51 From atoms to plant: co-production of green transport fuel and levoglucosan from waste biomass EPSRC £201,968 March 1, 2019 June 29, 2019 Closed 52 From atoms to plant: co-production of green transport fuel and levoglucosan from waste biomass EPSRC £504,920 March 1, 2019 June 30, 2019 Closed 53 From atoms to plant: co-production of green transport fuel and levoglucosan from waste biomass EPSRC £388,320 June 30, 2019 Sept. 14, 2020 Closed 54 Microwave-assisted upgrading of fast pyrolysis bio-oil using structured zeolites on microwave-absorbing foam supports EPSRC £397,718 Nov. 1, 2017 Oct. 31, 2019 Closed 55 Microwave-assisted upgrading of fast pyrolysis bio-oil using structured zeolites on microwave-absorbing foam supports EPSRC £994,295 Nov. 1, 2017 Oct. 31, 2019 Closed 56 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC £7,051,488 March 31, 2014 Sept. 13, 2024 Active 57 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC £17,639,430 March 31, 2014 Sept. 14, 2024 Active 58 Flexible and Efficient Power Plant: Flex-E-Plant EPSRC £5,991,000 July 31, 2013 Feb. 28, 2018 Closed 59 Flexible and Efficient Power Plant: Flex-E-Plant EPSRC £9,985,000 July 31, 2013 Feb. 28, 2018 Closed 60 Application of microwaves on the production of liquid biofuels EPSRC £201,984 Aug. 31, 2017 Feb. 29, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »