Home Projects More like: Solar Performance Mapping and Operational Yield Forecasting [Clear] # Title Funder Funding Start End Status 21 Forecasting Climate Change Impacts on Electricity Distribution Loads at Network Asset Level Innovate UK £219,634 April 30, 2014 Feb. 28, 2015 Closed 22 Forecasting Climate Change Impacts on Electricity Distribution Loads at Network Asset Level Innovate UK £549,085 April 30, 2014 Feb. 28, 2015 Closed 23 Hybrid physical-statistical modelling of wind farms and complex terrain - CASE project NERC £0 Sept. 30, 2020 Sept. 29, 2024 Active 24 Hybrid physical-statistical modelling of wind farms and complex terrain - CASE project NERC £0 Sept. 30, 2020 Sept. 30, 2024 Active 25 Wide-Area Instrumentation of Power Networks using Existing Infrastructure Innovate UK £1,300,616 June 30, 2016 June 29, 2019 Closed 26 Wide-Area Instrumentation of Power Networks using Existing Infrastructure Innovate UK £3,251,540 June 30, 2016 June 30, 2019 Closed 27 An operational UK air-sea carbon flux observation capability (CARBON-OPS) NERC £34,032 Aug. 12, 2007 Oct. 11, 2010 Closed 28 An operational UK air-sea carbon flux observation capability (CARBON-OPS) NERC £179,530 March 25, 2007 Oct. 24, 2010 Closed 29 An operational UK air-sea carbon flux observation capability (CARBON-OPS) NERC £385,124 March 1, 2007 Oct. 30, 2010 Closed 30 Siemens-EPSRC: Cloud-based solar forecasting for improved grid management EPSRC £100,744 Dec. 1, 2021 Feb. 28, 2023 Active 31 Siemens-EPSRC: Cloud-based solar forecasting for improved grid management EPSRC £251,860 March 1, 2022 Feb. 28, 2023 Closed 32 MetOcean Information Provision 'End-to-End' (MIPE2E) Innovate UK £445,898 June 30, 2011 March 31, 2013 Closed 33 MetOcean Information Provision 'End-to-End' (MIPE2E) Innovate UK £1,114,745 June 30, 2011 March 31, 2013 Closed 34 AMMA Further Analysis: Convective life-cycles over African continental surfaces NERC £1,875,335 May 31, 2010 Nov. 30, 2013 Closed 35 AMMA Further Analysis: Convective life-cycles over African continental surfaces NERC £288,570 May 6, 2010 May 6, 2013 Closed 36 MOSAIC Digital Environment Feasibility Study SPF £673,735 Nov. 15, 2019 Nov. 14, 2020 Closed 37 MOSAIC Digital Environment Feasibility Study SPF £142,360 Dec. 18, 2019 Dec. 17, 2020 Closed 38 MOSAIC Digital Environment Feasibility Study SPF £420,470 Nov. 14, 2019 Nov. 13, 2020 Closed 39 Scalable Additive Models for Forecasting Electricity Demand and Renewable Production EPSRC £0 Sept. 20, 2020 Dec. 20, 2024 Active 40 Scalable Additive Models for Forecasting Electricity Demand and Renewable Production EPSRC £0 Sept. 30, 2020 Dec. 20, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »