# Title Funder Funding Start End Status
41 Novel modular and eco-designed PEM electrolyser integrated with solar energy for green hydrogen production EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
42 Methodologies and simulation tools to support Operations and Maintenance (O&M) strategies and lifetime reliability assessment of Offshore Renewable En EPSRC
£0
Aug. 31, 2019 Aug. 30, 2023 Active
43 Methodologies and simulation tools to support Operations and Maintenance (O&M) strategies and lifetime reliability assessment of Offshore Renewable En EPSRC
£0
Aug. 31, 2019 Aug. 31, 2023 Closed
44 Novel low-cost methods for marine mammal and environmental monitoring NERC
£706,970
Jan. 1, 2018 June 30, 2020 Closed
45 Novel low-cost methods for marine mammal and environmental monitoring NERC
£1,767,425
Jan. 1, 2018 July 1, 2020 Closed
46 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC
£0
Sept. 30, 2021 March 30, 2025 Active
47 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC
£0
Sept. 30, 2021 March 31, 2025 Active
48 Mayflower - The Feasibility Study Innovate UK
£140,389
Aug. 31, 2021 March 30, 2022 Closed
49 Oceanways - zero emission autonomous cargo submarine Innovate UK
£741,720
Aug. 31, 2021 March 30, 2022 Active
50 Methanol powered zero-carbon vessel design study Innovate UK
£323,161
Sept. 30, 2022 Sept. 29, 2023 Active
51 Methanol powered zero-carbon vessel design study Innovate UK
£1,615,805
Sept. 30, 2022 Sept. 30, 2023 Closed
52 Flexible Routes to Liquid Fuels from CO2 by Advanced Catalysis and Engineering EPSRC
£3,608,530
March 30, 2016 Sept. 29, 2020 Closed
53 Flexible Routes to Liquid Fuels from CO2 by Advanced Catalysis and Engineering EPSRC
£9,021,325
March 30, 2016 Sept. 30, 2020 Closed
54 Integrating a mixed energy vector battolyser into a microgrid NERC
£12,770
Aug. 31, 2022 Aug. 30, 2023 Active
55 Integrating a mixed energy vector battolyser into a microgrid NERC
£63,850
Aug. 31, 2022 Aug. 31, 2023 Closed
56 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£252,097
July 24, 2022 Jan. 24, 2024 Active
57 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£1,260,485
July 24, 2022 Jan. 24, 2024 Active
58 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC
£240,882
Oct. 16, 2022 Oct. 15, 2023 Active
59 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC
£1,204,410
Oct. 16, 2022 Nov. 16, 2023 Closed
60 Ammonia as carbon-free energy vector - from green ammonia production to technoeconomic analysis EPSRC
£0
Sept. 30, 2022 Sept. 29, 2025 Active
Reset