Home Projects More like: Wind Turbine Foundation Ultrasonic Spectral Characterisation (WINSPEC) [Clear] # Title Funder Funding Start End Status 21 Reducing the ‘levelised cost of energy’ in offshore wind through a disruptive fault diagnosis technology, SmartCMS Innovate UK £1,517,780 Nov. 1, 2020 Jan. 31, 2022 Closed 22 Reducing the ‘levelised cost of energy’ in offshore wind through a disruptive fault diagnosis technology, SmartCMS Innovate UK £56,628 Dec. 1, 2021 Jan. 31, 2022 Closed 23 Reducing the ‘levelised cost of energy’ in offshore wind through a disruptive fault diagnosis technology, SmartCMS Innovate UK £141,570 Dec. 1, 2021 Jan. 31, 2022 Closed 24 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £276,434 Feb. 1, 2019 April 29, 2020 Closed 25 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £691,085 Feb. 1, 2019 April 30, 2020 Closed 26 Seismic response of monopiles in liquefiable soils EPSRC £0 Jan. 1, 2021 Jan. 1, 2025 Active 27 Nonlinear Wave Loads and Wave Hydrodynamic Effects on Offshore Wind Turbine Foundations EPSRC £0 March 1, 2007 May 31, 2007 Closed 28 Next Generation HVDC Network for the Offshore Renewable Energy Industry Innovate UK £218,890 Dec. 1, 2013 Nov. 30, 2014 Closed 29 Next Generation HVDC Network for the Offshore Renewable Energy Industry Innovate UK £547,225 Dec. 1, 2013 Nov. 30, 2014 Closed 30 Supergen Wind Hub EPSRC £5,934,376 June 18, 2014 Sept. 17, 2019 Closed 31 Supergen Wind Hub EPSRC £14,835,940 June 18, 2014 Sept. 18, 2019 Closed 32 Offshore Wind Charge Station Innovate UK £119,624 Sept. 30, 2020 Dec. 31, 2020 Closed 33 Offshore Wind Charge Station Innovate UK £299,060 Sept. 30, 2020 Dec. 31, 2020 Closed 34 Simulated Wake Effects Platform for Turbines (SWEPT) Innovate UK £211,710 May 31, 2013 May 30, 2014 Closed 35 Simulated Wake Effects Platform for Turbines (SWEPT) Innovate UK £529,275 May 31, 2013 May 31, 2014 Closed 36 Investigation of the causes for wind turbine underperformance and increased failure rates EPSRC, NERC £0 Sept. 30, 2018 Nov. 30, 2022 Closed 37 Bionic Adaptive Stretchable Materials for WEC (BASM-WEC) EPSRC £4,952,605 Sept. 30, 2021 Jan. 31, 2025 Active 38 Offshore Component Condition Monitoring via Machine Learning Enabled Smart Sensors and Low-bandwidth Data Transmission Innovate UK £287,614 April 30, 2021 Oct. 31, 2022 Active 39 Wind-AI: Wind Turbine Performance modelling utilising Deep Learning with LIDAR Validation Innovate UK £644,332 March 31, 2020 June 29, 2021 Closed 40 Wind-AI: Wind Turbine Performance modelling utilising Deep Learning with LIDAR Validation Innovate UK £1,610,830 March 31, 2020 June 30, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »