Home Projects More like: Modelling and optimisation for a coordinated interconnected multi-terminal DC transmission infrastructure for integration of offshore wind energy [Clear] # Title Funder Funding Start End Status 81 Intelligent Grid Interfaced Vehicle Eco-charging (iGIVE) EPSRC £4,275,550 Dec. 1, 2013 July 31, 2017 Closed 82 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience UKRI £2,755,446 Feb. 1, 2022 Jan. 31, 2026 Active 83 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience FLF £6,888,615 Feb. 1, 2022 Jan. 31, 2026 Active 84 EPSRC 1st Grant: "Compact Modular Multilevel Converters for Offshore Wind Integration" EPSRC £202,304 Sept. 30, 2017 Sept. 29, 2019 Closed 85 EPSRC 1st Grant: "Compact Modular Multilevel Converters for Offshore Wind Integration" EPSRC £505,760 Sept. 30, 2017 Sept. 30, 2019 Closed 86 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £1,280,436 July 30, 2014 Feb. 28, 2018 Closed 87 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £3,201,090 July 30, 2014 Feb. 28, 2018 Closed 88 Advanced study of the atmospheric flow Integrating REal climate conditions to enhance wind farm and wind turbine power production and increase components durability Horizon Europe Guarantee £2,475,295 Jan. 1, 2023 Dec. 31, 2026 Active 89 Low Carbon Transitions of Fleet Operations in Metropolitan Sites (LC TRANSFORMS) EPSRC £1,610,344 Dec. 1, 2015 Nov. 30, 2019 Closed 90 Low Carbon Transitions of Fleet Operations in Metropolitan Sites (LC TRANSFORMS) EPSRC £4,025,860 Dec. 1, 2015 Nov. 30, 2019 Closed 91 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 92 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 93 Use of Wind Farm Control on floating platforms for the U.S. offshore wind market, CONFLOWS Innovate UK £609,893 May 31, 2021 March 30, 2023 Active 94 Use of Wind Farm Control on floating platforms for the U.S. offshore wind market, CONFLOWS Innovate UK £914,838 May 31, 2021 March 31, 2023 Closed 95 Wind2DC: Medium Voltage DC Power Take Off Technologies for Floating Offshore Wind Turbine Energy Conversion and Collection Systems EPSRC £4,568,070 June 30, 2023 Feb. 28, 2027 Active 96 Data-Driven Power System Operation EPSRC £0 Jan. 1, 2017 June 30, 2020 Closed 97 Feasibility Assessment of a New Ultra-High Voltage Silicon Carbide Thyristor Technology for Multi-Megawatt Wind Turbines' Power Electronics Converters Innovate UK £229,114 June 30, 2013 June 29, 2014 Closed 98 Feasibility Assessment of a New Ultra-High Voltage Silicon Carbide Thyristor Technology for Multi-Megawatt Wind Turbines' Power Electronics Converters Innovate UK £572,785 June 30, 2013 June 30, 2014 Closed 99 MTVN: Multi-Terminal VSC-HVDC Networks - Grid Control EPSRC £1,069,724 Oct. 30, 2014 Oct. 28, 2017 Closed 100 MTVN: Multi-Terminal VSC-HVDC Networks - Grid Control EPSRC £2,674,310 Oct. 30, 2014 Oct. 29, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »