Home Projects More like: Wind-AI: Wind Turbine Performance modelling utilising Deep Learning with LIDAR Validation [Clear] # Title Funder Funding Start End Status 61 High performance pultrusion for advanced composites (HIPPAC) Innovate UK £590,322 Feb. 1, 2020 June 29, 2021 Closed 62 High performance pultrusion for advanced composites (HIPPAC) Innovate UK £1,475,805 Feb. 1, 2020 June 30, 2021 Closed 63 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £2,953,388 Nov. 2, 2015 April 30, 2019 Closed 64 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £7,383,470 Nov. 2, 2015 May 1, 2019 Closed 65 Wind Energy Technologies EPSRC £5,105,574 March 23, 2006 March 22, 2010 Closed 66 Wind Energy Technologies EPSRC £12,763,935 March 23, 2006 March 22, 2010 Closed 67 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £400,894 Oct. 2, 2016 Oct. 1, 2018 Closed 68 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £1,002,235 Oct. 2, 2016 Oct. 2, 2018 Closed 69 Intelligent Blade Controlled Wind Turbine Innovate UK £419,206 Dec. 1, 2019 March 30, 2021 Closed 70 Intelligent Blade Controlled Wind Turbine Innovate UK £1,048,015 Dec. 1, 2019 March 31, 2021 Closed 71 Novel Health & Usage Monitoring Solution for the Offshore Wind Turbine Industry Innovate UK £225,566 June 30, 2013 Sept. 29, 2014 Closed 72 Wind2DC: Medium Voltage DC Power Take Off Technologies for Floating Offshore Wind Turbine Energy Conversion and Collection Systems EPSRC £4,568,070 June 30, 2023 Feb. 28, 2027 Active 73 Wind Turbine Blade Repair Technology Innovate UK £172,074 Sept. 30, 2020 March 30, 2021 Closed 74 Wind Turbine Blade Repair Technology Innovate UK £430,185 Sept. 30, 2020 March 31, 2021 Closed 75 LOW COST MANUFACTURING PROCESS FOR LARGE DIAMETER WIND TURBINE SEALS Innovate UK £145,938 Nov. 1, 2020 April 29, 2021 Closed 76 Design of novel, additively manufactured cellular lattice supported composite structures using topology optimisation EPSRC £0 Sept. 30, 2019 Jan. 31, 2024 Active 77 MasterFilter Compatibility for All Wind Turbines Innovate UK £14,519 Dec. 1, 2022 Feb. 28, 2023 Active 78 System Level Design and Feasibility of the Myriad Multi-rotor Wind Turbine Concept Innovate UK £47,190 Nov. 1, 2022 April 29, 2023 Active 79 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 29, 2024 Active 80 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 30, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »