# Title Funder Funding Start End Status
21 Feasibility of an Innovative Methodology for Testing Marine Current Turbines in Unsteady Flow EPSRC
£69,958
March 31, 2008 June 29, 2009 Closed
22 Feasibility of an Innovative Methodology for Testing Marine Current Turbines in Unsteady Flow EPSRC
£266,564
March 31, 2008 June 29, 2009 Closed
23 Feasibility of an Innovative Methodology for Testing Marine Current Turbines in Unsteady Flow EPSRC
£666,410
March 31, 2008 June 30, 2009 Closed
24 WindSurf- Smart energy for the 21st century Innovate UK
£843,910
Sept. 30, 2016 June 29, 2018 Closed
25 WindSurf- Smart energy for the 21st century Innovate UK
£2,109,775
Sept. 30, 2016 June 30, 2018 Closed
26 Structural Integrity of Torque Transmitting Articulating Joints EPSRC
£0
Sept. 30, 2017 Sept. 30, 2021 Closed
27 Structural Integrity of Torque Transmitting Articulating Joints EPSRC
£0
Sept. 30, 2017 Sept. 30, 2018 Closed
28 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC
£1,802,754
Feb. 1, 2012 July 30, 2015 Closed
29 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC
£4,506,885
Feb. 1, 2012 July 31, 2015 Closed
30 Characterising Flow Regimes and Transitions, Heat Transport and Energy/Enstrophy Cascades in Rapidly Rotating Thermal Convection EPSRC
£492,081
Sept. 30, 2022 Sept. 29, 2025 Active
31 Dynamics of Mooring System for Floating Offshore Wind Turbine (FOWT) EPSRC
£0
Jan. 1, 2018 Sept. 29, 2021 Closed
32 Dynamics of Mooring System for Floating Offshore Wind Turbine (FOWT) EPSRC, NERC
£0
Jan. 1, 2018 Sept. 30, 2021 Closed
33 Simulations tools to enable Asset Life Extension (SALE) Innovate UK
£252,188
Sept. 30, 2016 March 30, 2018 Closed
34 Simulations tools to enable Asset Life Extension (SALE) Innovate UK
£630,470
Sept. 30, 2016 March 31, 2018 Closed
35 A Revolutionary Rotary Ericsson Heat Pump/Engine Innovate UK
£141,152
Sept. 30, 2016 Nov. 30, 2017 Closed
36 Minimising the Total Cost of Ownership of Large-Scale Flue Gas Treatment Plants in The Renewable Energy Sector EPSRC, NERC
£0
Sept. 30, 2018 Dec. 31, 2022 Closed
37 ALPACA: Axial-Lateral Pile Analysis for Chalk Applying multi-scale field and laboratory testing EPSRC
£2,242,616
Sept. 30, 2017 March 30, 2020 Closed
38 ALPACA: Axial-Lateral Pile Analysis for Chalk Applying multi-scale field and laboratory testing EPSRC
£5,606,540
Sept. 30, 2017 March 31, 2020 Closed
39 Development of gravity driven electrical energy storage system Innovate UK
£50,000
April 30, 2012 Dec. 31, 2012 Closed
40 Impacts of Atmospheric Turbulence on Wind Turbine Main-Bearing Function and Failures EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
Reset