Home Projects More like: Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters [Clear] # Title Funder Funding Start End Status 61 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC £201,454 March 21, 2017 May 23, 2018 Closed 62 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC £503,635 March 21, 2017 May 24, 2018 Closed 63 Towards Enhanced HVDC Cable Systems EPSRC £2,227,608 Oct. 14, 2014 Oct. 13, 2018 Closed 64 Towards Enhanced HVDC Cable Systems EPSRC £5,569,020 Oct. 14, 2014 Oct. 14, 2018 Closed 65 A Low Cost, High Capacity, Smart Residential Distribution Network Enabled By SiC Power Electronics EPSRC £585,150 March 25, 2015 Jan. 31, 2017 Closed 66 A Low Cost, High Capacity, Smart Residential Distribution Network Enabled By SiC Power Electronics EPSRC £269,154 Feb. 1, 2017 March 24, 2018 Closed 67 A Low Cost, High Capacity, Smart Residential Distribution Network Enabled By SiC Power Electronics EPSRC £672,885 Feb. 1, 2017 March 24, 2018 Closed 68 A Low Cost, High Capacity, Smart Residential Distribution Network Enabled By SiC Power Electronics EPSRC £1,462,875 March 25, 2015 Jan. 31, 2017 Closed 69 Transformation of the Top and Tail of Energy Networks EPSRC £8,264,142 Sept. 30, 2011 Sept. 29, 2015 Closed 70 Transformation of the Top and Tail of Energy Networks EPSRC £20,660,355 Sept. 30, 2011 Sept. 30, 2015 Closed 71 Prosperity Partnerships EPSRC £5,294,966 Nov. 1, 2017 May 30, 2023 Active 72 Prosperity Partnerships UUI £13,237,415 Nov. 1, 2017 May 31, 2023 Closed 73 SYNAPS - SYNchronous Automation and Protection System EPSRC £486,570 May 31, 2015 May 30, 2017 Closed 74 SYNAPS (Synchronous Analysis and Protection System) EPSRC £398,590 Nov. 1, 2015 Jan. 31, 2018 Closed 75 SYNAPS - SYNchronous Automation and Protection System EPSRC £1,216,425 May 31, 2015 May 31, 2017 Closed 76 SYNAPS (Synchronous Analysis and Protection System) EPSRC £996,475 Nov. 1, 2015 Jan. 31, 2018 Closed 77 Silicon Compatible GaN Power Electronics EPSRC £12,393,434 March 1, 2013 Aug. 30, 2018 Closed 78 Silicon Compatible GaN Power Electronics EPSRC £30,983,585 March 1, 2013 Aug. 31, 2018 Closed 79 International Collaboration Sabbatical: To Foster Long-term Collaboration with Leading Control and Power Electronics Experts in the USA EPSRC £212,250 April 9, 2012 April 29, 2013 Closed 80 International Collaboration Sabbatical: To Foster Long-term Collaboration with Leading Control and Power Electronics Experts in the USA EPSRC £286,666 Jan. 16, 2012 April 8, 2012 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »