Home Projects More like: Flow Control Reliability and Optimisation [Clear] # Title Funder Funding Start End Status 41 Modelling of Thermal Energy Storage EPSRC £0 Sept. 30, 2018 Sept. 29, 2021 Closed 42 Modelling of Thermal Energy Storage EPSRC £0 Sept. 30, 2018 Dec. 31, 2021 Closed 43 Modelling of Thermal Energy Storage EPSRC £0 Sept. 30, 2018 Sept. 30, 2021 Closed 44 Modelling of Thermal Energy Storage EPSRC, NERC £0 Sept. 30, 2018 Dec. 31, 2021 Closed 45 Ultra-high energy density redox flow batteries EPSRC, NERC £0 Sept. 30, 2017 Dec. 31, 2021 Closed 46 Can quantum algorithms revolutionise the simulation of turbulent flows? EPSRC £201,821 Sept. 30, 2022 Jan. 31, 2024 Active 47 Can quantum algorithms revolutionise the simulation of turbulent flows? EPSRC £1,009,105 Jan. 3, 2023 May 2, 2024 Active 48 Active control of fluid flows in gas turbines EPSRC £1,570,348 March 30, 2014 Sept. 28, 2017 Closed 49 Zinc Ion Batteries: Structural ENgineering for Severe Environment (SENSE) EPSRC £772,306 Sept. 30, 2021 Sept. 29, 2024 Closed 50 Zinc Ion Batteries: Structural ENgineering for Severe Environment (SENSE) EPSRC £362,711 Feb. 1, 2022 Sept. 29, 2024 Active 51 Redox Flow Battery Materials for Energy Storage EPSRC £0 Sept. 30, 2019 March 30, 2023 Active 52 Redox Flow Battery Materials for Energy Storage EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed 53 The ChargeSync Household Smart Box - an intelligent energy storage system Innovate UK £304,008 May 31, 2015 Aug. 30, 2017 Closed 54 The Multi-float WaveSub Wave Energy Converter (WEC) Innovate UK £639,655 Sept. 30, 2016 March 31, 2018 Closed 55 Safer low-cost nuclear material storage through cold-spray formed boron carbide coated components (SAFESTORE) Innovate UK £189,000 Dec. 1, 2010 Feb. 29, 2012 Closed 56 Safer low-cost nuclear material storage through cold-spray formed boron carbide coated components (SAFESTORE) Innovate UK £472,500 Dec. 1, 2010 Feb. 29, 2012 Closed 57 Engineering Robust Cathodes for Sustainable Energy Storage EPSRC £292,639 Sept. 30, 2022 Sept. 29, 2024 Active 58 Engineering Robust Cathodes for Sustainable Energy Storage EPSRC £1,463,195 Sept. 30, 2022 Sept. 30, 2024 Active 59 Innovative surface treatment and coatings for thermal power plant components EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 60 Modelling the multi-scale spatial variations in the geomechanical properties within the discontinuities of the Sherwood Sandstone Group and their infl NERC £0 Sept. 11, 2022 March 11, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »