Home Projects More like: Non contact microphone array for structural health diagnostics combined with active noise and vibration cancellation for wind turbine nacelle machinery (CMDRIVE) [Clear] # Title Funder Funding Start End Status 1 Non contact microphone array for structural health diagnostics combined with active noise and vibration cancellation for wind turbine nacelle machinery (CMDRIVE) Innovate UK £872,805 March 1, 2014 Feb. 28, 2015 Closed 2 Bio-fouling self-cleaning condition monitoring system for offshore wind turbine foundations (BIOclean-CMS) Innovate UK £179,916 July 31, 2013 Oct. 31, 2014 Closed 3 Bio-fouling self-cleaning condition monitoring system for offshore wind turbine foundations (BIOclean-CMS) Innovate UK £449,790 July 31, 2013 Oct. 31, 2014 Closed 4 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £370,240 Feb. 1, 2019 July 30, 2020 Closed 5 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £925,600 Feb. 1, 2019 July 31, 2020 Closed 6 Offshore Component Condition Monitoring via Machine Learning Enabled Smart Sensors and Low-bandwidth Data Transmission Innovate UK £287,614 April 30, 2021 Oct. 31, 2022 Active 7 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 29, 2024 Active 8 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 30, 2024 Active 9 In-service X-ray radiography of offshore wind blades (RADBLAD) Innovate UK £1,540,542 March 31, 2019 June 29, 2021 Closed 10 In-service X-ray radiography of offshore wind blades (RADBLAD) ISCF £3,851,355 March 31, 2019 June 30, 2021 Closed 11 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 12 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 13 Wake Anemometry for Yaw control: laboratory Demonstration, Ruggedisation and Field Testing Innovate UK £299,984 Sept. 30, 2016 Dec. 31, 2017 Closed 14 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC £338,246 May 28, 2019 Dec. 31, 2021 Closed 15 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC £845,615 May 28, 2019 Dec. 31, 2021 Closed 16 Wind2DC: Medium Voltage DC Power Take Off Technologies for Floating Offshore Wind Turbine Energy Conversion and Collection Systems EPSRC £4,568,070 June 30, 2023 Feb. 28, 2027 Active 17 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £652,520 Jan. 5, 2009 July 3, 2012 Closed 18 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £1,631,300 Jan. 5, 2009 July 4, 2012 Closed 19 WindTwin - Digital Twin of Wind Turbines for real time continuous monitoring and inspection Innovate UK £2,707,636 June 30, 2017 Dec. 31, 2019 Closed 20 WindTwin - Digital Twin of Wind Turbines for real time continuous monitoring and inspection Innovate UK £6,769,090 June 30, 2017 Dec. 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »