Home Projects More like: Dynamic Controlled Demand responding to system frequency deviation for synthetic inertia support [Clear] # Title Funder Funding Start End Status 1 Dynamic Controlled Demand responding to system frequency deviation for synthetic inertia support EPSRC £0 Sept. 30, 2018 March 31, 2022 Closed 2 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £591,264 Dec. 15, 2014 April 29, 2018 Closed 3 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £1,478,160 Dec. 15, 2014 April 30, 2018 Closed 4 1+3 year Project MRES YEAR EPSRC £0 Sept. 24, 2017 Sept. 23, 2018 Closed 5 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 6 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC £0 Sept. 30, 2020 Dec. 31, 2024 Active 7 Reliable and Efficient System for Community Energy Solution- RESCUES EPSRC £1,910,184 Feb. 1, 2014 March 28, 2018 Closed 8 Reliable and Efficient System for Community Energy Solution- RESCUES EPSRC £4,775,460 Feb. 1, 2014 March 29, 2018 Closed 9 Evidencing and authenticating energy demand side response using high frequency electricity disaggregation and distributed ledger technologies EPSRC £0 Sept. 23, 2018 Feb. 1, 2021 Closed 10 Interfacing Next-Generation Grid-Scale Storage to the Electrical Power Network (Inter-Storage) EPSRC £840,201 Aug. 31, 2022 Aug. 30, 2024 Active 11 Interfacing Next-Generation Grid-Scale Storage to the Electrical Power Network (Inter-Storage) EPSRC £4,201,005 Aug. 31, 2022 Dec. 31, 2024 Active 12 Converter Architectures EPSRC £2,518,800 Nov. 1, 2017 Oct. 30, 2021 Closed 13 Converter Architectures EPSRC £6,297,000 Nov. 1, 2017 Oct. 31, 2021 Closed 14 Detection of loss of grid event in distributed generation systems using pattern recognition EPSRC £476,976 Oct. 31, 2012 April 29, 2016 Closed 15 Detection of loss of grid event in distributed generation systems using pattern recognition EPSRC £1,192,440 Oct. 31, 2012 April 30, 2016 Closed 16 Data-Driven Predictive Control for Ensuring Grid Security with High Penetration of Wind Energy EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 17 DC Networks with DC/DC Converters for Integration of Large Renewable Sources EPSRC £1,469,570 May 30, 2013 Dec. 16, 2016 Closed 18 DC Networks with DC/DC Converters for Integration of Large Renewable Sources EPSRC £3,673,925 May 30, 2013 Dec. 16, 2016 Closed 19 Using Electric Vehicles for Demand Side Frequency Regulation of a Smart Grid EPSRC £0 Sept. 30, 2019 March 30, 2023 Active 20 Using Electric Vehicles for Demand Side Frequency Regulation of a Smart Grid EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »