Home Projects More like: FLITES: Fibre Laser Imaging of gas Turbine Exhaust Species [Clear] # Title Funder Funding Start End Status 61 Fractal forcing of axisymmetric turbulent jets; both fully developed and impulsively forced EPSRC £202,190 Dec. 31, 2014 Dec. 30, 2016 Closed 62 Non-Destructive Detection of In-Service Corrosion on Gas Turbine Components EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed 63 Spectral Leading Edge Serrations for the Reduction of Aerofoil-Turbulence Interaction Noise EPSRC £895,406 June 28, 2012 June 29, 2015 Closed 64 Spectral Leading Edge Serrations for the Reduction of Aerofoil-Turbulence Interaction Noise EPSRC £2,238,515 June 28, 2012 June 30, 2015 Closed 65 Additively manufactured heat exchangers for ultra-high bypass ratio turbofans Innovate UK £175,000 June 30, 2020 Oct. 30, 2021 Closed 66 Collaborative Research and Development: Environmental Lightweight Fan (ELF) Programme: Project C Innovate UK £3,177,146 July 31, 2009 June 29, 2013 Closed 67 Active control of fluid flows in gas turbines EPSRC £1,570,348 March 30, 2014 Sept. 28, 2017 Closed 68 Meeting 100gbps network requirements for 2km fibre optic network links to reduce energy use in data centres Innovate UK £1,369,516 Feb. 1, 2018 Oct. 31, 2019 Closed 69 Advanced vibration control measures for high performance rotating machines EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 70 Modelling environmentally assisted cracking in Ni-based superalloys EPSRC £0 Sept. 30, 2019 March 31, 2024 Active 71 Underwater large-area high resolution monitoring by Distributed Optical Fibre Acoustic Sensors NERC £483,778 Nov. 15, 2019 Feb. 9, 2021 Closed 72 Underwater large-area high resolution monitoring by Distributed Optical Fibre Acoustic Sensors SPF £1,209,445 Nov. 15, 2019 Feb. 9, 2021 Closed 73 Degradation of ceramic coatings in demanding environments EPSRC £0 Sept. 20, 2020 March 31, 2024 Active 74 Novel Integrated Imaging Approaches for Damage Characterisation of Composite Materials and Structures EPSRC £0 May 31, 2017 Nov. 30, 2020 Closed 75 Enhanced Software Defined Telemetry for Ground and Flight Testing Innovate UK £991,674 June 30, 2019 Dec. 31, 2021 Closed 76 Advanced Repair of Turbine Engine Materials In-Service (ARTEMIS) Innovate UK £1,786,520 April 30, 2016 April 29, 2019 Closed 77 Project 11 Core Demonstrator Concept Innovate UK £23,861,703 Sept. 30, 2013 March 30, 2015 Closed 78 Closed Loop Flow Control for Aeroengines EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 79 Novel Manufacture of Heat Exchangers Innovate UK £648,756 Jan. 1, 2017 March 30, 2018 Closed 80 Novel Manufacture of Heat Exchangers Innovate UK £1,621,890 Jan. 1, 2017 March 31, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »