Home Projects More like: LOW COST MANUFACTURING PROCESS FOR LARGE DIAMETER WIND TURBINE SEALS [Clear] # Title Funder Funding Start End Status 61 Impacts of Atmospheric Turbulence on Wind Turbine Main-Bearing Function and Failures EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 62 Evance 15kW Ultra Low Noise Wind Turbine Innovate UK £200,000 Jan. 1, 2012 Dec. 31, 2012 Closed 63 Evance 15kW Ultra Low Noise Wind Turbine Innovate UK, NERC £500,000 Jan. 1, 2012 Dec. 31, 2012 Closed 64 System Level Design and Feasibility of the Myriad Multi-rotor Wind Turbine Concept Innovate UK £47,190 Nov. 1, 2022 April 29, 2023 Active 65 New Thyristors for T & D Applications (NEWTON) EPSRC £380,054 March 31, 2007 Dec. 31, 2010 Closed 66 Development of gravity driven electrical energy storage system Innovate UK £50,000 April 30, 2012 Dec. 31, 2012 Closed 67 Validation of robotic inspection and maintenance of offshore wind turbine blades Innovate UK £336,602 March 31, 2021 Sept. 29, 2021 Closed 68 Validation of robotic inspection and maintenance of offshore wind turbine blades ISCF £841,505 March 31, 2021 Sept. 30, 2021 Closed 69 Isopower Innovate UK £10,000 July 31, 2014 Jan. 31, 2015 Closed 70 The role of order and disorder in impact absorbing materials EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 71 Modelling Gas Turbine Blade Degradation in a High Fidelity Digital Twin EPSRC £0 June 7, 2020 June 6, 2024 Active 72 Enabling technology for robotic inspection and maintenance of offshore wind turbine blades Innovate UK £117,252 Dec. 1, 2017 Aug. 30, 2018 Closed 73 The FeTu roticulating concept - air compressor/supercharger feasibility study Innovate UK £629,804 Aug. 31, 2017 Aug. 30, 2018 Closed 74 Understanding the In-Reactor Performance of Advanced Ceramic Cladding Materials EPSRC £1,222,990 June 30, 2015 Aug. 31, 2018 Closed 75 Refuse (33t) and Fire Truck (12-18t) Electric Drive Unit Innovate UK £397,501 June 30, 2021 March 30, 2022 Closed 76 Minimising the adverse effects of water jetting EPSRC £202,406 Jan. 16, 2017 Jan. 15, 2019 Closed 77 Minimising the adverse effects of water jetting EPSRC £506,015 Jan. 16, 2017 Jan. 15, 2019 Closed 78 In-service degradation in Gas Turbines EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 79 EVT-M3 - Manufacturing the transition to zero emission fleets Innovate UK £423,902 July 31, 2021 March 30, 2022 Closed 80 EVT-M3 - Manufacturing the transition to zero emission fleets Innovate UK £2,119,510 July 31, 2021 March 31, 2022 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »