# Title Funder Funding Start End Status
61 Tracer-free, non-intrusive, time- and space-resolved temperature and scalar measurements EPSRC
£787,048
July 31, 2020 July 30, 2023 Active
62 EPSRC Centre for Doctoral Training in Industry-Inspired Photonic Imaging, Sensing and Analysis EPSRC
£26,136,563
Sept. 30, 2019 March 31, 2028 Active
63 Structural Metallic Systems For Advanced Gas Turbine Applications EPSRC
£4,981,190
Sept. 30, 2009 Sept. 29, 2014 Closed
64 EPSRC Centre for Doctoral Training in Industrial Functional Coatings: COATED2 EPSRC
£5,388,098
May 17, 2015 March 30, 2023 Active
65 EPSRC Centre for Doctoral Training in Industrial Functional Coatings: COATED2 EPSRC
£13,477,350
May 17, 2015 March 31, 2023 Closed
66 Improving Turbine Efficiency by Combining the Effects of Rim Seals and End-wall Contours in the Presence of Purge Flow EPSRC
£1,674,934
Sept. 30, 2015 March 31, 2019 Closed
67 TAILORED COMPOSITES FOR TUNED DEFORMATION RESPONSE TO UNSTEADY FLUID LOADING EPSRC
£849,508
May 22, 2011 Dec. 11, 2014 Closed
68 EPSRC Centre for Doctoral Training in Wind and Marine Energy Systems and Structures EPSRC
£32,833,482
March 31, 2019 Sept. 30, 2027 Active
69 Strategic Partnership in Structural Metallic Systems for Gas Turbines EPSRC
£15,879,126
Sept. 30, 2014 Sept. 29, 2019 Closed
70 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£2,580,280
June 30, 2021 June 29, 2026 Active
71 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£6,450,700
June 30, 2021 June 30, 2026 Active
72 An investigation into combined film and internal cooling of turbine blades EPSRC
£202,340
March 31, 2018 March 30, 2021 Closed
73 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
74 Transforming heat-recovery system performance by exploiting multi component turbine flows EPSRC
£1,597,430
Dec. 1, 2014 Nov. 30, 2019 Closed
75 Transforming heat-recovery system performance by exploiting multi component turbine flows EPSRC
£3,993,575
Dec. 1, 2014 Nov. 30, 2019 Closed
76 Hydrogen fuel technologies for future propulsion and power (HOPE) UKRI
£2,217,320
Sept. 30, 2020 Sept. 29, 2024 Active
77 AIM (Advanced Instability Methods) for industry EPSRC
£675,904
Jan. 1, 2011 June 29, 2014 Closed
78 Achieving high power heat-recovery systems using molecularly-complex fluids EPSRC
£200,012
March 7, 2012 March 6, 2014 Closed
79 Achieving high power heat-recovery systems using molecularly-complex fluids EPSRC
£500,030
March 7, 2012 March 6, 2014 Closed
80 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC
£2,199,782
Dec. 1, 2014 May 30, 2018 Closed
Reset