Home Projects More like: Sources, Sinks and Subsidies of Carbon within Coastal Saltmarsh Habitats [Clear] # Title Funder Funding Start End Status 1 Terrestrial Carbon Cycle Dynamics in CMIP5 Last Glacial Maximum and mid-Holocene climate simulations NERC £182,696 April 30, 2011 May 30, 2012 Closed 2 Transport through Carbon electrodes and New Catalysts for an Organic-Air Hybrid Redox Flow Battery EPSRC £0 Feb. 1, 2018 July 30, 2021 Closed 3 Transport through Carbon electrodes and New Catalysts for an Organic-Air Hybrid Redox Flow Battery EPSRC £0 Feb. 1, 2018 July 31, 2021 Closed 4 Looking below the surface: Revealing Interfacial Reactions for Sustainable Electrochemical Technologies UKRI £1,522,212 March 21, 2022 March 20, 2026 Active 5 Looking below the surface: Revealing Interfacial Reactions for Sustainable Electrochemical Technologies FLF £7,611,060 March 21, 2022 March 20, 2026 Active 6 Synthesis and characterisation of organic electrodes for batteries. EPSRC £0 Sept. 26, 2022 Sept. 29, 2026 Active 7 BAS Climate NERC £7,027,015 March 31, 2009 March 30, 2015 Closed 8 BAS Climate NERC £7,027,015 March 31, 2009 March 30, 2015 Closed 9 Investigating Corrosion in Supercritical Fluids EPSRC £565,452 Sept. 10, 2019 March 10, 2023 Active 10 Investigating Corrosion in Supercritical Fluids EPSRC £1,413,630 Sept. 10, 2019 March 10, 2023 Closed 11 In Situ Incubation and Filtration System for the Pelagic Ocean (InSIncFS) NERC £749,223 Nov. 7, 2022 July 5, 2024 Active 12 Earth's weathering reactor: carbon source or sink over short and long time-scales? NERC £1,109,000 July 12, 2017 Dec. 31, 2020 Closed 13 A Climate Compatible Industrial Strategy NERC £705,602 Jan. 1, 2018 Sept. 29, 2018 Closed 14 A Climate Compatible Industrial Strategy NERC £552,196 Sept. 30, 2018 May 7, 2022 Active 15 A Climate Compatible Industrial Strategy NERC £1,764,005 Jan. 1, 2018 Sept. 30, 2018 Closed 16 A Climate Compatible Industrial Strategy NERC £1,380,490 Sept. 30, 2018 May 8, 2022 Closed 17 The abiotic and biotic factors determining microbial respiration, a key process in ocean carbon storage (MicroRESPIRE) NERC £196,848 Aug. 2, 2022 Aug. 1, 2024 Active 18 The abiotic and biotic factors determining microbial respiration, a key process in ocean carbon storage (MicroRESPIRE) NERC £6,560 Aug. 2, 2022 Aug. 1, 2024 Active 19 Options for Net Zero Plus and Climate Change Adaptation NERC £47,201,000 June 30, 2022 March 31, 2026 Active 20 In-situ spectroscopic investigations of Fischer-Tropsch catalysts EPSRC £0 Sept. 15, 2019 Dec. 30, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »