Home Projects More like: DEVELOPMENT OF DC TRANSFORMER AND FAULT CURRENT LIMITER FOR HIGH-POWER DC NEWTORKS [Clear] # Title Funder Funding Start End Status 61 Fugro Marine Remote Operations Centre ISCF £249,160 June 30, 2020 Sept. 30, 2020 Closed 62 DC Grid development and de-centralized generation in Dalston: Arcola Better Connected Innovate UK £74,946 July 31, 2013 Oct. 31, 2013 Closed 63 Newton Fund: A High Efficiency, Low Cost and Building Integratable Solar Photovoltaic/Thermal System for Space Heating, Hot Water and Power Supply EPSRC £774,830 March 31, 2017 June 29, 2019 Closed 64 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 65 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC £0 Sept. 30, 2020 Dec. 31, 2024 Active 66 Newton Fund: A High Efficiency, Low Cost and Building Integratable Solar Photovoltaic/Thermal System for Space Heating, Hot Water and Power Supply EPSRC £119,044 June 29, 2018 June 29, 2019 Closed 67 Newton Fund: A High Efficiency, Low Cost and Building Integratable Solar Photovoltaic/Thermal System for Space Heating, Hot Water and Power Supply EPSRC £206,436 March 31, 2017 June 28, 2018 Closed 68 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £1,280,436 July 30, 2014 Feb. 28, 2018 Closed 69 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £3,201,090 July 30, 2014 Feb. 28, 2018 Closed 70 Feasibility Study for Shore Power in Aberdeen Harbour Innovate UK £823,196 Aug. 31, 2021 March 30, 2022 Closed 71 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC £1,760,862 March 31, 2013 March 30, 2016 Closed 72 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC £4,402,155 March 31, 2013 March 31, 2016 Closed 73 Purchase of Six Component Wind Tunnel Balance EPSRC £1,509,988 June 30, 2018 Dec. 31, 2021 Closed 74 Purchase of Six Component Wind Tunnel Balance EPSRC £3,774,970 June 30, 2018 Dec. 31, 2021 Closed 75 Flame Solid Oxide Fuel Cells, Simple Devices to Extract Electricity Directly from Natural Gas and Liquid Petroleum Gas Flames EPSRC £527,536 June 30, 2015 Dec. 31, 2017 Closed 76 Flame Solid Oxide Fuel Cells, Simple Devices to Extract Electricity Directly from Natural Gas and Liquid Petroleum Gas Flames EPSRC £1,453,024 Jan. 6, 2014 June 29, 2015 Closed 77 Flame Solid Oxide Fuel Cells, Simple Devices to Extract Electricity Directly from Natural Gas and Liquid Petroleum Gas Flames EPSRC £3,632,560 Jan. 6, 2014 June 30, 2015 Closed 78 Flame Solid Oxide Fuel Cells, Simple Devices to Extract Electricity Directly from Natural Gas and Liquid Petroleum Gas Flames EPSRC £1,318,840 June 30, 2015 Dec. 31, 2017 Closed 79 Sinusoidal DC Supercharging - A technology platform to revolutionise electric vehicle charging Innovate UK £652,700 July 31, 2017 July 31, 2018 Closed 80 Nanocoating improvements for Hydrogen Generation - R6 Cont Innovate UK £28,453 Jan. 1, 2023 March 30, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »