Home Projects More like: Multilevel Methods for Large-Scale Nonlinear Optimization [Clear] # Title Funder Funding Start End Status 1 Algorithms for Large-Scale Nonlinearly Constrained Optimization EPSRC £1,681,360 Oct. 16, 2007 Oct. 16, 2010 Closed 2 Energy Efficient Control EPSRC £742,794 Aug. 31, 2015 Aug. 30, 2019 Closed 3 Energy Efficient Control EPSRC £858,214 Aug. 31, 2015 July 31, 2019 Closed 4 EPSRC-SFI: Krylov subspace methods for non-symmetric PDE problems: a deeper understanding and faster convergence EPSRC £1,779,055 July 31, 2023 July 31, 2026 Active 5 EPSRC-SFI: Krylov subspace methods for non-symmetric PDE problems: a deeper understanding and faster convergence EPSRC £355,811 April 30, 2023 April 29, 2026 Active 6 Responsive Algorithmic Enterprise (RAE) EPSRC £164,758 March 31, 2017 March 30, 2018 Closed 7 Responsive Algorithmic Enterprise (RAE) EPSRC £411,895 March 31, 2017 March 31, 2018 Closed 8 EPSRC DTP Hub for Sustainable Transport: Electrical Vehicle Routing Optimization Using Machine Learning EPSRC £0 Sept. 30, 2020 June 30, 2024 Active 9 Multilevel optimization problems with nonconvexities and their applications to smart-grids EPSRC £0 Aug. 31, 2020 Aug. 30, 2024 Active 10 Multilevel optimization problems with nonconvexities and their applications to smart-grids EPSRC £0 Aug. 31, 2020 Aug. 31, 2024 Active 11 Novel Asynchronous Algorithms and Software for Large Sparse Systems EPSRC £155,962 Feb. 1, 2011 July 30, 2014 Closed 12 Novel Asynchronous Algorithms and Software for Large Sparse Systems EPSRC £295,902 Sept. 30, 2010 March 30, 2014 Closed 13 Novel Asynchronous Algorithms and Software for Large Sparse Systems EPSRC £642,202 Sept. 30, 2010 March 30, 2014 Closed 14 Novel Asynchronous Algorithms and Software for Large Sparse Systems EPSRC £155,094 Feb. 1, 2011 Sept. 30, 2014 Closed 15 Novel Asynchronous Algorithms and Software for Large Sparse Systems EPSRC £382,612 Sept. 30, 2010 March 30, 2014 Closed 16 Novel Asynchronous Algorithms and Software for Large Sparse Systems EPSRC £1,605,505 Sept. 30, 2010 March 31, 2014 Closed 17 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC £202,124 May 31, 2018 June 29, 2020 Closed 18 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC £505,310 May 31, 2018 June 30, 2020 Closed 19 Optimal control methods with application to aerospace systems EPSRC £0 Sept. 30, 2019 March 30, 2023 Active 20 Optimal control methods with application to aerospace systems EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »