Home Projects More like: Multilevel Inverter Topologies for MVDC [Clear] # Title Funder Funding Start End Status 21 Design Developement of an integration solution to utilise spare capacity in transport systems to provide local energy supplies in dense urban centres. ISCF £240,345 July 31, 2020 Jan. 31, 2021 Closed 22 Cost-Effective Generator & MVDC Integration for Wind Farms EPSRC £0 Aug. 31, 2020 Aug. 30, 2024 Active 23 Cost-Effective Generator & MVDC Integration for Wind Farms EPSRC £0 Aug. 31, 2020 Aug. 31, 2024 Active 24 RHYTHM: Resilient Hybrid Technology for High-Value Microgrids EPSRC £1,970,486 June 30, 2016 March 31, 2019 Closed 25 RHYTHM: Resilient Hybrid Technology for High-Value Microgrids EPSRC £4,926,215 June 30, 2016 March 31, 2019 Closed 26 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £1,280,436 July 30, 2014 Feb. 28, 2018 Closed 27 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £3,201,090 July 30, 2014 Feb. 28, 2018 Closed 28 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC £1,043,994 Aug. 31, 2008 Feb. 29, 2012 Closed 29 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC £2,609,985 Aug. 31, 2008 Feb. 29, 2012 Closed 30 SOPs annd PECs in distribution networks - control interactions and operational logic EPSRC, NERC £0 Sept. 30, 2018 Dec. 31, 2022 Closed 31 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC £123,862 Aug. 31, 2007 Sept. 29, 2008 Closed 32 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC £254,162 March 31, 2006 Aug. 30, 2007 Closed 33 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC £635,405 March 31, 2006 Aug. 31, 2007 Closed 34 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC £0 Aug. 31, 2007 Sept. 30, 2008 Closed 35 DC networks, power quality and plant reliability EPSRC £716,484 Nov. 1, 2019 April 29, 2023 Active 36 DC networks, power quality and plant reliability EPSRC £1,454,310 Nov. 1, 2019 Dec. 31, 2023 Active 37 DC networks, power quality and plant reliability EPSRC £1,306,518 Jan. 6, 2020 June 29, 2024 Active 38 DC networks, power quality and plant reliability EPSRC £3,635,775 Nov. 1, 2019 Dec. 31, 2023 Active 39 Feasibility Assessment of a New Ultra-High Voltage Silicon Carbide Power Electronics Converter Technology for Electricity Grids Innovate UK £49,274 July 31, 2013 Nov. 30, 2013 Closed 40 Analysis of Power Quality in Complex DC Power Networks EPSRC £199,532 June 29, 2015 Sept. 29, 2016 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »