Home Projects More like: Bayesian Inference for Geotechnical Modelling and Parameter Calibration [Clear] # Title Funder Funding Start End Status 1 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 2 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 3 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 4 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 5 Offshore Wind Turbine Foundation EPSRC £0 Sept. 30, 2016 Sept. 29, 2020 Closed 6 Offshore Wind Turbine Foundation EPSRC £0 Sept. 30, 2016 Sept. 30, 2020 Closed 7 Advanced Numerical Modelling of Offshore Wind Turbine (OWT) Foundations in Sand EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 8 Mechanics of rock discontinuities uner elevated temperatures and pressures EPSRC £0 Sept. 30, 2015 Jan. 31, 2020 Closed 9 Volcano Monitoring using InSAR: application to the Cascades Volcanoes NERC £345,330 Sept. 30, 2011 Sept. 30, 2015 Closed 10 Novel approach to Marine Energy device instrumenting and real-time sensor data processing EPSRC £0 Aug. 31, 2019 Aug. 30, 2023 Active 11 Novel approach to Marine Energy device instrumenting and real-time sensor data processing EPSRC £0 Aug. 31, 2019 Aug. 31, 2023 Closed 12 Proglacial lakes and their impact on Himalayan glacier evolution NERC £0 Jan. 1, 2022 June 29, 2025 Active 13 Proglacial lakes and their impact on Himalayan glacier evolution NERC £0 Jan. 1, 2022 June 30, 2025 Active 14 Standardisation of a Thermal Memory System - STORM Innovate UK £220,668 Nov. 1, 2019 Jan. 31, 2021 Closed 15 Coating Substitution for Reduced Environmental Impact (SUSCOAT) EPSRC £758,290 Jan. 1, 2010 Dec. 31, 2013 Closed 16 The ecological and evolutionary significance of functional variation in mitochondria in a wild animal. NERC £0 Sept. 30, 2021 March 30, 2025 Active 17 The ecological and evolutionary significance of functional variation in mitochondria in a wild animal. NERC £0 Sept. 30, 2021 March 31, 2025 Active 18 Active fault slip-rates and earthquake recurrence controlled by stress transfer and viscous flow NERC £3,247,700 Aug. 31, 2021 Aug. 31, 2024 Active 19 Improved ground stiffness measurements for offshore wind turbine EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 20 Improved ground stiffness measurements for offshore wind turbine EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »