Home Projects More like: Infrared detection of functional waters and protonatable amino acids; solving the proton-electron coupling mechanism of cytochrome oxidase [Clear] # Title Funder Funding Start End Status 1 Mechanistic studies of H2 oxidation and evolution catalysed by NiFe hydrogenase enzymes EPSRC £0 Sept. 30, 2017 March 30, 2021 Closed 2 Mechanistic studies of H2 oxidation and evolution catalysed by NiFe hydrogenase enzymes EPSRC £0 Sept. 30, 2017 March 31, 2021 Closed 3 Using light to drive chemistry in natural light-activated enzymes. BBSRC £0 Sept. 30, 2018 Dec. 30, 2022 Active 4 Using light to drive chemistry in natural light-activated enzymes. NERC £0 Sept. 30, 2018 Dec. 30, 2022 Closed 5 Investigation of Water Oxidizing Catalysis for Renewable Energy BBSRC £981,366 Oct. 12, 2008 Oct. 11, 2013 Closed 6 Investigation of Water Oxidizing Catalysis for Renewable Energy BBSRC £2,453,415 Oct. 12, 2008 Oct. 12, 2013 Closed 7 Function and regulation of mitochondrial cytochrome c oxidase using mutant forms of the yeast enzyme BBSRC £873,406 Sept. 30, 2012 March 25, 2016 Closed 8 Function and regulation of mitochondrial cytochrome c oxidase using mutant forms of the yeast enzyme BBSRC £2,183,515 Sept. 30, 2012 March 25, 2016 Closed 9 Generalised Photocatalysis by Enzymes (GENPENZ) BBSRC £3,178,051 Aug. 31, 2022 Aug. 30, 2027 Active 10 Generalised Photocatalysis by Enzymes (GENPENZ) BBSRC £15,890,255 Feb. 1, 2023 Jan. 31, 2028 Active 11 Catalysis in motion: accessing how fast motions facilitate catalysis through pump-probe and fast time resolved spectroscopies. EPSRC £2,120,170 June 30, 2012 June 29, 2017 Closed 12 Catalysis in motion: accessing how fast motions facilitate catalysis through pump-probe and fast time resolved spectroscopies. EPSRC £5,300,425 June 30, 2012 June 30, 2017 Closed 13 High Spec Raman Spectrometer Regional Facility EPSRC £47,154 Aug. 25, 2015 Aug. 24, 2018 Closed 14 Molecular stopwatch measurements of dynamics in catalysts, battery electrolytes and ionic liquids in situ UKRI £1,682,130 April 30, 2019 April 29, 2023 Active 15 A hybrid strategy for massive acceleration of directed evolution: meeting the need for high-turnover enzymes in industrial biotechnology. BBSRC £1,498,358 Sept. 2, 2018 Dec. 2, 2022 Closed 16 A hybrid strategy for massive acceleration of directed evolution: meeting the need for high-turnover enzymes in industrial biotechnology. BBSRC £3,745,895 Sept. 2, 2018 Dec. 2, 2022 Closed 17 The structure and dynamics of water confined in nanoscale pools: the dynamic crossover EPSRC £358,120 July 31, 2012 July 30, 2015 Closed 18 The structure and dynamics of water confined in nanoscale pools: the dynamic crossover EPSRC £813,574 Nov. 30, 2012 May 30, 2016 Closed 19 Building Solar-Powered, Carbon-Fixing Protoalgae BBSRC £757,544 Nov. 2, 2015 Nov. 1, 2018 Closed 20 Building Solar-Powered, Carbon-Fixing Protoalgae BBSRC £1,893,860 Nov. 2, 2015 Nov. 1, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »