Home Projects More like: Project Description for Measurement of In-Service Turbine Blade Clearance, and Transmission through the Casing Wall. [Clear] # Title Funder Funding Start End Status 21 Nature-based Carbon Removal Verification Innovate UK £420,180 Jan. 1, 2021 March 31, 2021 Closed 22 Closed Loop Flow Control for Aeroengines EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 23 High-temperature Silicon Carbide Electronics (HITSIC) EPSRC £644,976 March 29, 2009 Sept. 27, 2012 Closed 24 High-temperature Silicon Carbide Electronics (HITSIC) EPSRC £1,612,440 March 29, 2009 Sept. 28, 2012 Closed 25 Computer-aided design of zinc phosphide heterojunctions for efficient solar energy conversion EPSRC £1,050,506 June 28, 2018 Sept. 13, 2021 Closed 26 Micro-CHP using steam ejector/water turbine (WaterGen) EPSRC £297,574 Jan. 1, 2016 Dec. 31, 2016 Closed 27 Micro-CHP using steam ejector/water turbine (WaterGen) EPSRC £743,935 Jan. 1, 2016 Dec. 31, 2016 Closed 28 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £417,522 Aug. 31, 2014 May 30, 2016 Closed 29 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £104,080 Aug. 24, 2016 Nov. 24, 2016 Closed 30 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £1,043,805 Aug. 31, 2014 May 31, 2016 Closed 31 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £260,200 Aug. 24, 2016 Nov. 24, 2016 Closed 32 Thin neutron detector on a chip utilising silicon carbide EPSRC £1,201,775 Sept. 30, 2018 June 30, 2021 Closed 33 All-perovskite Multi-junction Solar Cells EPSRC £4,318,972 Nov. 1, 2018 Oct. 31, 2023 Active 34 All-perovskite Multi-junction Solar Cells EPSRC £10,797,430 Nov. 1, 2018 July 31, 2024 Active 35 Fundamentals of static crack growth in nickel-based superalloys after friction welding EPSRC £0 June 30, 2021 March 30, 2022 Active 36 Sensors in Extreme Environments EPSRC £2,718,380 March 1, 2006 Feb. 28, 2011 Closed 37 Investigation of the power balance in advanced divertor configurations on MAST-U. EPSRC £0 Sept. 30, 2017 Sept. 30, 2021 Closed 38 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters Innovate UK £688,750 Sept. 30, 2014 Sept. 29, 2016 Closed 39 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters Innovate UK £1,721,875 Sept. 30, 2014 Sept. 30, 2016 Closed 40 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC £0 Feb. 1, 2018 Feb. 28, 2022 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »