Home Projects More like: Development of detectability criteria to quantify defects visibility in simulated radiographic images of industrial structures [Clear] # Title Funder Funding Start End Status 61 Valid8 Turbine Inspection Innovate UK £66,016 March 1, 2020 Dec. 31, 2020 Closed 62 INSPECT (In-situ optical inspection of engine components) Innovate UK £2,447,732 Jan. 1, 2018 March 30, 2021 Closed 63 Transferability of small-specimen data to large-scale component fracture assessment EPSRC £2,621,980 March 1, 2013 June 30, 2015 Closed 64 Advanced Non-Destructive Testing of Blade Manufacturing Defects EPSRC, NERC £0 Sept. 30, 2018 Dec. 31, 2022 Closed 65 Autonomous Vehicle for Inspection of offshore wind farm Subsea INfrastructure (AVISIoN) Innovate UK £602,754 Sept. 30, 2017 Sept. 29, 2019 Closed 66 Autonomous Vehicle for Inspection of offshore wind farm Subsea INfrastructure (AVISIoN) Innovate UK £1,506,885 Sept. 30, 2017 Sept. 30, 2019 Closed 67 Smart energy infrastructure for future power networks EPSRC £0 Sept. 27, 2020 Sept. 30, 2023 Active 68 Smart energy infrastructure for future power networks EPSRC £0 Sept. 30, 2020 Oct. 1, 2023 Closed 69 wind turbines EPSRC £0 Sept. 30, 2016 Sept. 29, 2020 Closed 70 Design rules for defect-tolerant photovoltaics EPSRC £757,154 June 6, 2021 June 5, 2024 Active 71 Design rules for defect-tolerant photovoltaics EPSRC £1,892,885 June 6, 2021 June 6, 2024 Active 72 Fully Submerged Evolution of SeaGen for Exposed Open Deep Water Locations EPSRC £195,302 Dec. 1, 2010 May 30, 2012 Closed 73 High Volume Manufacture and Inspection Processes for Composite Pipes Innovate UK £1,415,018 June 30, 2019 June 29, 2021 Closed 74 NDE, DEsign and Engineering Critical Assessments (NDECA): Bridging the gaps EPSRC £1,418,580 Dec. 1, 2018 Nov. 30, 2022 Closed 75 Defects by Design; Understanding and Controlling Defect Processes in Advanced Energy Materials EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Active 76 Realistic fault modelling to enable optimization of low power IoT and Cognitive fault-tolerant computing systems EPSRC £974,398 Jan. 1, 2021 Dec. 31, 2023 Active 77 Realistic fault modelling to enable optimization of low power IoT and Cognitive fault-tolerant computing systems EPSRC £892,480 Jan. 1, 2021 Dec. 31, 2023 Active 78 Reducing the Impact of Social distancing To Offshore Renewable Energy (RISTORE) Innovate UK £838,100 Sept. 30, 2020 June 30, 2021 Closed 79 Development of a robotic maintenance system for wind turbine blades (ROMAIN) Horizon Europe Guarantee £2,103,455 Aug. 31, 2022 Aug. 31, 2025 Active 80 Romain - Development of a robotic maintenance system for wind turbine blades Horizon Europe Guarantee £2,163,905 Aug. 31, 2022 Aug. 31, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »