Home Projects More like: Impact of High Concentrations of SO2 and SO3 in Carbon Capture Applications and its Mitigation [Clear] # Title Funder Funding Start End Status 21 Magnetic metal-organic framework composites for pollutant gas capture EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 22 Magnetic metal-organic framework composites for pollutant gas capture EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 23 Ultra-Supercritical (USC) steam power generation technology with Circulating Fluidized Bed (CFB): Combustion, Materials and Modelling (USC-CFB-CMM) EPSRC £2,066,770 March 31, 2015 Nov. 30, 2018 Closed 24 Ultra-Supercritical (USC) steam power generation technology with Circulating Fluidized Bed (CFB): Combustion, Materials and Modelling (USC-CFB-CMM) EPSRC £5,166,925 March 31, 2015 Nov. 30, 2018 Closed 25 An innovative oxy-fired supercritical CO2 power cycle for highly flexible electricity generation EPSRC £0 Aug. 31, 2017 Aug. 30, 2019 Closed 26 An innovative oxy-fired supercritical CO2 power cycle for highly flexible electricity generation EPSRC £0 Aug. 31, 2017 Aug. 31, 2019 Closed 27 Novel Low-Temperature Plasma-Catalyst Control of Dioxin & Furan Emissions from Waste Incinerators EPSRC £1,526,826 Aug. 31, 2021 Aug. 30, 2024 Active 28 Novel Low-Temperature Plasma-Catalyst Control of Dioxin & Furan Emissions from Waste Incinerators EPSRC £3,817,065 Aug. 31, 2021 Aug. 31, 2024 Active 29 Carbon Abatement Using Surface Engineering Technologies (CASET) Innovate UK £1,624,900 March 31, 2010 March 31, 2013 Closed 30 Step Change Adsorbents and Processes for CO2 Capture. EPSRC £7,904,405 Nov. 1, 2009 Oct. 31, 2013 Closed 31 CO2 Post-Combustion Capture Using Amine Impregnated Synthetic Zeolites EPSRC £960,510 Jan. 1, 2014 Dec. 31, 2016 Closed 32 Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Plants - AMPGas EPSRC £2,222,520 Aug. 31, 2012 Aug. 30, 2016 Closed 33 Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Plants - AMPGas EPSRC £5,556,300 Aug. 31, 2012 Aug. 31, 2016 Closed 34 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £2,548,872 Sept. 30, 2014 Sept. 29, 2016 Closed 35 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £1,455,818 Sept. 30, 2016 June 29, 2019 Closed 36 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £6,372,180 Sept. 30, 2014 Sept. 30, 2016 Closed 37 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £3,639,545 Sept. 30, 2016 June 30, 2019 Closed 38 Gas-FACTS: Gas - Future Advanced Capture Technology Options - Consortium proposal by Cranfield, Edinburgh, Imperial, Leeds and Sheffield EPSRC £4,922,176 March 31, 2012 Dec. 31, 2015 Closed 39 Gas-FACTS: Gas - Future Advanced Capture Technology Options - Consortium proposal by Cranfield, Edinburgh, Imperial, Leeds and Sheffield EPSRC £12,305,440 March 31, 2012 Dec. 31, 2015 Closed 40 Computational Modelling and Optimisation of Carbon Capture Reactors EPSRC £2,904,795 Jan. 30, 2013 Sept. 11, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »