# Title Funder Funding Start End Status
41 Defect-engineered metal-organic frameworks for carbon dioxide capture EPSRC
£485,210
April 30, 2018 Jan. 31, 2020 Closed
42 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£3,848,592
March 1, 2016 June 29, 2020 Closed
43 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£226,712
June 30, 2020 Dec. 31, 2020 Closed
44 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£566,780
June 30, 2020 Dec. 31, 2020 Closed
45 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£9,621,480
March 1, 2016 June 30, 2020 Closed
46 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC
£7,051,488
March 31, 2014 Sept. 13, 2024 Active
47 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC
£17,639,430
March 31, 2014 Sept. 14, 2024 Active
48 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC
£199,806
Feb. 12, 2020 Aug. 10, 2021 Closed
49 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC
£499,515
Feb. 12, 2020 Aug. 11, 2021 Closed
50 DiSECCS: Diagnostic Seismic toolbox for the Efficient Control of CO2 Storage EPSRC
£4,469,415
Sept. 10, 2013 March 10, 2017 Closed
51 Beyond Iron in the Ocean: Trace metal micronutrients and the carbon cycle (BIO-Trace) NERC
£1,122,466
Jan. 1, 2018 June 29, 2019 Closed
52 Beyond Iron in the Ocean: Trace metal micronutrients and the carbon cycle (BIO-Trace) NERC
£799,410
June 30, 2019 Oct. 31, 2024 Active
53 Beyond Iron in the Ocean: Trace metal micronutrients and the carbon cycle (BIO-Trace) NERC
£1,998,525
June 30, 2019 Oct. 31, 2024 Active
54 Beyond Iron in the Ocean: Trace metal micronutrients and the carbon cycle (BIO-Trace) NERC
£2,806,165
Jan. 1, 2018 June 30, 2019 Closed
55 Real-Time H2 Purification and Monitoring for Efficient and Durable Fuel Cell Vehicles EPSRC
£2,011,640
March 14, 2014 Sept. 12, 2018 Closed
56 Real-Time H2 Purification and Monitoring for Efficient and Durable Fuel Cell Vehicles EPSRC
£5,029,100
March 14, 2014 Sept. 13, 2018 Closed
57 How does ocean warming and steric sea level rise depend on carbon emissions? NERC
£483,462
April 30, 2014 April 29, 2016 Closed
58 UK Indemand: a National Research Centre for reducing Industrial Energy and Material use in supplying UK needs EPSRC
£12,346,136
July 14, 2013 Aug. 24, 2015 Closed
59 UK Indemand: a National Research Centre for reducing Industrial Energy and Material use in supplying UK needs EPSRC
£30,865,340
July 14, 2013 Aug. 25, 2015 Closed
60 Mechanistic controls of surface warming by ocean heat and carbon uptake NERC
£810,120
May 31, 2016 Aug. 30, 2019 Closed
Reset