# Title Funder Funding Start End Status
1 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£602,472
Dec. 31, 2014 June 29, 2018 Closed
2 SBRC NOTTINGHAM: Sustainable Routes to Platform Chemicals BBSRC
£28,485,710
July 30, 2014 March 30, 2022 Closed
3 GASCHEM: Optimising industrial gas fermentation for commercial low-carbon fuel & chemical production through systems and synthetic biology approaches BBSRC
£4,792,272
Aug. 30, 2013 Feb. 2, 2019 Closed
4 GASCHEM: Optimising industrial gas fermentation for commercial low-carbon fuel & chemical production through systems and synthetic biology approaches BBSRC
£11,980,680
Aug. 30, 2013 Feb. 2, 2019 Closed
5 Ultra-Reduced Polyoxometalates as Electron-Coupled-Proton-Systems for Energy Storage EPSRC
£1,124,112
June 30, 2018 June 29, 2021 Closed
6 Ultra-Reduced Polyoxometalates as Electron-Coupled-Proton-Systems for Energy Storage EPSRC
£2,810,280
June 30, 2018 June 30, 2021 Closed
7 Nano-structured Catalysts for CO2 Transformation to Fuels and Products EPSRC
£2,976,330
April 30, 2013 April 29, 2017 Closed
8 Nano-structured Catalysts for CO2 Transformation to Fuels and Products EPSRC
£7,440,825
April 30, 2013 April 30, 2017 Closed
9 Sustainable excretable biofuels process design and optimisation EPSRC
£608,000
May 21, 2017 May 20, 2020 Closed
10 Sustainable excretable biofuels process design and optimisation EPSRC
£1,520,000
May 21, 2017 May 21, 2020 Closed
11 Understanding and Improving Electrochemical Carbon Dioxide Capture UKRI
£2,839,228
Jan. 1, 2021 Dec. 31, 2024 Active
12 Oscillatory baffled reactor for enhanced 1C gas bioconversion for energy production and storage BBSRC
£196,818
Jan. 1, 2016 Dec. 31, 2016 Closed
13 Oscillatory baffled reactor for enhanced 1C gas bioconversion for energy production and storage BBSRC
£492,045
Jan. 1, 2016 Dec. 31, 2016 Closed
14 Waste water re-mediation and power generation using an electrochemical device EPSRC
£304,384
Feb. 1, 2016 April 29, 2017 Closed
15 Waste water re-mediation and power generation using an electrochemical device EPSRC
£760,960
Feb. 1, 2016 April 30, 2017 Closed
16 Nanocrystalline Water Splitting Photodiodes II: Device Engineering, Integration and Scale-up EPSRC
£583,696
April 30, 2011 April 29, 2014 Closed
17 Nanocrystalline Water Splitting Photodiodes II: Device Engineering, Integration and Scale-up EPSRC
£1,459,240
April 30, 2011 April 30, 2014 Closed
18 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£3,848,592
March 1, 2016 June 29, 2020 Closed
19 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£226,712
June 30, 2020 Dec. 31, 2020 Closed
20 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC
£566,780
June 30, 2020 Dec. 31, 2020 Closed
Reset